Title Page
-
Client:
-
Site Name (Phase/Block):
-
Contract Number:
-
Date:
-
Carried out by:
-
New System (A, B)
Evacuation System Commission, Acceptance & Testing Certificate
A - System Examinations & Recommendations
-
Installation work is, as far as can be reasonably be ascertained, of an acceptable standard
-
All Zones seen by control panel
-
All devices seen by control panel
-
Device schedule present
-
Devices activated and alarm sounding
-
First Aid activated and alarm sounding (where applicable)
-
Devices LED test completed
-
Control Panel LED indicators test completed
-
Visual check of the entire system
-
Auto dialer operational (where applicable)
-
Adequate alarm test log book present
-
Adequate operation and maintenance manual for the system provided
-
Control Panel standby power supplies provided (mains voltage)
-
Devices standby power supplies condition (battery check)
-
All other equipment operates correctly (Tamper, PIRs)
-
Adequate alarm test log book present
I/We being the competent person(s) responsible (as indicated by my/our signature below) for the commissioning of the evacuation system, particulars of which are set out above, CERTIFY the above system as to the best of my/our knowledge is functional.
-
Full Name
-
Signature
-
Position
-
Date
B - System Acceptance & Handover
-
All Equipment Operates Correctly
-
Installation work is, as far as can be reasonably be ascertained, of an acceptable standard
-
An adequate operation and maintenance manual for the system has been provided
I/We being the client responsible (as indicated by my/our signature below) for the acceptance of the evacuation system, particulars of which are set out above, ACCEPT the system on behalf of:
-
Full Name
-
Signature
-
Position
-
Date
GUIDANCE NOTES FOR CLIENT/END USER
OVER A DAILY PERIOD
-
Check charger ON control panel indicator shows
-
Inspect for FAULT indicator showing
-
Inspect for BATTERY indicator showing
-
Visually inspect all detector devices are accessible
-
Visually inspect all system devices
OVER A WEEKLY PERIOD
-
Ensure devices LED indicators show (Devices LED test)
-
Operate a call point to test system
-
Operate First Aid to test system (where applicable)
-
Check ALL sounders operate
-
Check ALL call point and detector devices are accessible
-
Reset the evacuation alarm panel
-
Check control panel history log
-
Enter results in end user log book