Title Page

  • Client:

  • Site Name (Phase/Block):

  • Contract Number:

  • Date:

  • Carried out by:

  • New System (A, B)

Evacuation System Commission, Acceptance & Testing Certificate

A - System Examinations & Recommendations

  • Installation work is, as far as can be reasonably be ascertained, of an acceptable standard

  • All Zones seen by control panel

  • All devices seen by control panel

  • Device schedule present

  • Devices activated and alarm sounding

  • First Aid activated and alarm sounding (where applicable)

  • Devices LED test completed

  • Control Panel LED indicators test completed

  • Visual check of the entire system

  • Auto dialer operational (where applicable)

  • Adequate alarm test log book present

  • Adequate operation and maintenance manual for the system provided

  • Control Panel standby power supplies provided (mains voltage)

  • Devices standby power supplies condition (battery check)

  • All other equipment operates correctly (Tamper, PIRs)

  • Adequate alarm test log book present

I/We being the competent person(s) responsible (as indicated by my/our signature below) for the commissioning of the evacuation system, particulars of which are set out above, CERTIFY the above system as to the best of my/our knowledge is functional.

  • Full Name

  • Signature

  • Position

  • Date

B - System Acceptance & Handover

  • All Equipment Operates Correctly

  • Installation work is, as far as can be reasonably be ascertained, of an acceptable standard

  • An adequate operation and maintenance manual for the system has been provided

I/We being the client responsible (as indicated by my/our signature below) for the acceptance of the evacuation system, particulars of which are set out above, ACCEPT the system on behalf of:

  • Full Name

  • Signature

  • Position

  • Date

GUIDANCE NOTES FOR CLIENT/END USER

OVER A DAILY PERIOD

  • Check charger ON control panel indicator shows

  • Inspect for FAULT indicator showing

  • Inspect for BATTERY indicator showing

  • Visually inspect all detector devices are accessible

  • Visually inspect all system devices

OVER A WEEKLY PERIOD

  • Ensure devices LED indicators show (Devices LED test)

  • Operate a call point to test system

  • Operate First Aid to test system (where applicable)

  • Check ALL sounders operate

  • Check ALL call point and detector devices are accessible

  • Reset the evacuation alarm panel

  • Check control panel history log

  • Enter results in end user log book

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.