Title Page

  • Site conducted

  • Document No.

  • Client / Site

  • Site Manager

  • Contract Manager

  • Conducted on

  • Prepared by

  • Personnel on site

1.0 GENERAL DOCUMENTATION

1.0 GENERAL DOCUMENTATION

  • 1.1 Have actions from previous inspections been closed out?

1.2 CONSTRUCTION PHASE PLAN (HS154)

  • 1.2.1 Has the CPP been completed correctly and current version is available on site?

  • 1.2.2 Has the CPP been approved by PD / CDM-A?

  • Guidance

  • Things to check: scope of works and delivery team, F10 reference, correct version

1.3 F10

  • Is the project notifiable?

  • 1.3.1 Is F10 issued, displayed and valid?

  • Guidance

  • A project is notifiable when:
    •The construction is scheduled to last longer than 30 working days, and it will have more than 20 workers working at the same time at any point in the building project.
    •Or, if the construction work has more than 500 person days.

1.4 INDUCTIONS

  • 1.4.1 Have all site operatives and visitors received site specific induction? (ISC-NC)

  • Guidance

  • Inductions should be completed and signed by both the operative and site manager. Induction flip chart should be present on site, used to deliver the induction. Induction should also include COVID specific measures.

  • 1.4.2 Is there evidence site operatives competence & training qualifications are being checked?

  • CSCS cards (or equivalent) should be checked for all operatives before they commence works. Copies kept electronically or with their site induction.

1.5 FIRE RISK ASSESSMENT (HS048) (ISC-NC)

  • 1.5.1 Is a suitable and sufficient FRA displayed on site? (ISC-NC)

  • 1.5.2 Is a site fire and emergency plan on display? (ISC-NC)

1.6 TRAFFIC / SITE SET UP / EMERGENCY PLAN DRAWING

  • 1.6.1 Has a suitable Traffic Management plan been developed and displayed in accordance with relevant Pre-Construction information?

  • 1.6.2 Have all relevant permits (street and pavement) been obtained and displayed?

1.7 SIGN IN / OUT REGISTER (ISC-NC)

  • 1.7.1 Are all operatives signing in/out? (ISC-NC)

1.8 RAMS

  • 1.8.1 Are contractor RAMS available & site specific?

  • 1.8.2 Have suitable site specific RAMS been completed for HBP workers?

  • Guidance

  • Contractor & HBP RAMS should contain site & task specific risk management processes.

  • 1.8.3 Have RAMS been reviewed and approved by HBP?

  • 1.8.4 Is there evidence RAMS have been briefed to and understood by site operatives?

1.9 GDPR COMPLIANCE (ISC-NC)

  • 1.9.1 Is all personal and confidential information stored in a secure place? (ISC-NC)

1.10 TOOL BOX TALKS

  • 1.10.1 Is there evidence of regular tool box talks taking place?

  • Guidance

  • TBT should be carried out at least once a week on relevant subjects. Records of attendance and content should be kept

2.0 SITE SET UP

2.0 SITE SET UP

2.1 SIGNS AND INFORMATION

  • 2.1.1 Is there suitable signage located around the work areas and compound, both internally & externally?

  • Guidance

  • Safety signage around the perimeter of site and within work area. Should also include site contact details upon entrance.

  • 2.1.2 Are the Site Hazards for today clearly displayed on site?

  • 2.1.3 Is emergency information displayed clearly and up to date?

2.2 ACCESS AND SECURITY (ISC-NC)

  • 2.2.1 Is external access to site controlled to prevent unauthorised access? (ISC-NC)

  • 2.2.2 Are pedestrians suitably segregated from vehicles?

2.3 HOUSEKEEPING

  • 2.3.1 Are roads / areas around site / site compound clear of mud and areas clear of litter?

  • 2.3.2 Is the site generally tidy with walkways clear and free from debris and cables managed to prevent trip hazards?

  • 2.3.3 Are all materials, work equipment & waste stored safely within the site / work area in previously agreed and suitable place?

2.4 WORK ENVIRONMENT

  • 2.4.1 Is there sufficient room for each trade to perform their job safely?

  • 2.4.2 Is sufficient lighting provided (both general and task specific)?

2.5 PARKING

  • 2.5 Is there evidence of controlled parking, no vans / delivery vehicles blocking access routes of neighbouring properties or causing problems to flow of traffic?

2.6 WELFARE

  • 2.6.1 Are there suitable welfare facilities on site as per Schedule 2 (CDM Regulations 2015)?

  • Guidance

  • Under CDM, the below should be available and checked
    - adequate toilet and hand washing facilities (1-5=1, 6-25=2, 26-50=3, 51-75=4, 76-100=5)
    - hot and cold running water in toilets
    - drinking water
    - foot storage and preparation appliances
    - adequate tables and seating
    - drying room (if carrying out groundworks)
    - designated smoking area (away from the public and combustible/flammable materials)

  • 2.6.2 Are the facilities clean, tidy & stocked?

  • Guidance

  • Shared areas should be cleaned regularly and stocked with relevant consumables including hand wash and hand sanitiser.

3.0 WORK EQUIPMENT

3.0 WORK EQUIPMENT

3.1 LADDERS / STEPLADDERS

  • 3.1.1 Are ladders / stepladders in good condition and used safely in accordance with manufacturer's instructions and HBP procedure?

  • 3.1.2 Have permits been issued for use of ladders

  • 3.1.3 Is there an inspection regime for ladders & are they identified

3.2. MOBILE PLANT

  • 3.2.1 Is mobile plant (excavators, MEWPs, rollers, dumpers, forklifts etc) used correctly by trained personnel in accordance with manufacturer's instructions?

  • 3.2.2 Has all mobile plant been segregated to avoid others entering the work area?

  • 3.2.3 Are up to date Thorough Examination certs available for all mobile plant on site?

  • 3.2.4 Are daily / weekly formal inspections up to date, being carried out and filed on site?

3.3 MOBILE TOWERS / PODIUMS

  • 3.3.1 Are mobile towers / podiums assembled, used and inspected by a competent person in accordance with manufacturer's instructions?

3.4 PORTABLE APPLIANCES

  • 3.4.1 Are portable appliances tools and extension leads in good condition and subject to regular inspections?

  • Guidance

  • 3 monthly PAT test for all site equipment.

3.5. PPE

  • 3.5.1 Are operatives on site wearing all required PPE (as per their RAMS )?

4.0 QUALITY PROCESSES

4.0 Quality Processes

4.1 COMPANY BRANDING

  • 4.1.1 Does the site make a good first impression

  • 4.1.2 Are Smartstart boards in place, displaying relevant information and in good condition with correct logo

  • 4.1.3 Are contractors wearing unbranded/own branded or HB/Client PPE (e.g Vis vests/hard hats)

4.2 SIGNAGE

  • 4.2.1 Where Client specific signage is required, is this in place?

4.3 PROJECT HEALTH CHECKS

  • 4.3.1 Has a Project Health Check been completed in the last 2 weeks?

4.4 PROJECT RISK REGISTER

  • 4.4.1 When was the Risk Register last updated?

  • 4.4.2 Have relevant project-specific risks been captured in the register

4.5 QUALITY CHECKS

  • 4.5.1 Is there evidence that contractor works are being checked throughout installation?

  • 4.5.2 Are inspection records / snagging reports being issued to contractors and closed out.

5.0 EMERGENCY PLANNING

5.0 EMERGENCY PLANNING

5.1 FIRE

  • 5.1.1 Are all fire exits unlocked, clear from obstructions and appropriately signposted from inside and outside?

  • 5.1.2 Is the fire alarm system in full working order (permenant/temporary)and there is a sufficient number of alarms on site?

  • 5.1.3 Is there sufficient number of fire extinguishers and a proof that they have been serviced in the last 12 month? (except P50 as they are corrosion proof)

  • 5.1.4 Are the fire evacuation assembly areas in safe locations, clear of the building and away from fire brigade vehicle access and parking?

  • 5.1.5 Are all flammable substances (e.g pressurised gases) being stored correctly in well-ventilated area with fire extinguishers in attendance, and highlighted on the site fire plan?

  • 5.1.6 Are all temporary protective coverings to a Loss Prevention Certification Board Standard? (LPS 1207 internally and LPS 1215 externally)

5.2 FIRST AID

  • 5.2.1 Are all site First Aiders clearly identified and their details displayed on site?

  • 5.2.2 Does the first aider hold a 3 day First Aid at Work certificate?

  • 5.2.3 Are the first aid supplies in date, suitable and sufficient for the work taking place?

5.3 ACCIDENTS / INCIDENTS / NEAR MISS REPORTING

  • 5.3.2 Is there evidence that accidents, near misses and good calls are being reported for the site?

  • 5.2.3 Has the escalation and investigation process been followed (both internal and external)?

6.0 HEALTH AND WELL BEING

6.0 HEALTH AND WELL BEING

6.1 ASBESTOS

  • Is the building pre-2000?

  • 6.1.2 Has an R&D survey been completed and available on site?

  • 6.1.3 Is there evidence of asbestos awareness training received by site operatives?

  • 6.1.4 Have we removed any asbestos?

  • 6.1.5 Have clearance certificates or clean air tests and hazardous waste transfer notes been collated and filed on site?

6.2 SUBSTANCES HAZARDOUS TO HEALTH

  • 6.2.1 Are COSHH Assessments and data sheets available for all hazardous substances present on site?

  • 6.2.2 Are storage conditions being adhered to for hazardous substances kept on site?

6.3 DUST AND FUMES

  • Are activities creating dust / fumes being undertaken?

  • 6.3.1 Is 'on tool' extraction or water suppression being used to control dust?

  • 6.3.2 Is class M or H (for silica) industrial vacuum available on site?

  • 6.3.3 Are all dust masks FFP3 as a minimum?

  • 6.3.4 Are copies of face fit certificates available on site?

  • 6.3.5 If used indoors, are all diesel / petrol operated plant equipped with exhaust fume filter and forced ventilation being used?

6.4 HAVS

  • Is vibration-producing equipment being used on site?

  • 6.4.1 Are individual vibration exposure levels being assessed, monitored and recorded?

  • 6.4.2 Are control measures in place

6.5 MANUAL HANDLING

  • Are there any manual handling tasks being performed on site?

  • 6.5.1 Have mechanical aids been considered and provided to avoid manual handling?

  • 6.5.2 Are there risk assessments in place to cover the manual handling activities?

  • 6.5.3 Are the manual handling operations being carried out in line with the risk assessment?

6.6 MENTAL HEALTH

  • 6.6.1 Is a MHFA appointed for the project and contact details on display?

  • 6.6.2 Is relevant information available regarding mental health/wellbeing initiatives?

  • Guidance

  • This could include information on the Construction Industry helpline, the Lighthouse Club charity and any internal initiatives

6.7 NOISE

  • Are noisy operations being carried out?

  • 6.7.1 Are hearing protection zones established and clearly identified if necessary?

  • 6.7.2 Are engineering controls used where needed?

  • 6.7.3 Is hearing protection used as and when required?

6.8 HYGIENE

  • 6.8.1 Are there suitable control measures in place to protect against the spread of viruses and illnesses (including COVID 19)?

  • Guidance

  • Control measures should include hand sanitising stations upon entry to site and in communal areas, cleaning regime in place, suitably stocked cleaning materials and adequate ventilation in working areas. Subcontractor RAMS should also include control measures.

6.9 OTHER HEALTH HAZARDS

  • 6.9.1 Are there any other health hazards present on site?

7.0 SPECIALIST ACTIVITY

7.0 SPECIALIST ACTIVITY

7.1 CONFINED SPACE

  • Are there any confined space works carried out?

  • 7.1.1 Is there a detailed safe work procedure available and followed including emergency procedures?

  • 7.1.2 Has a confined space permit been issued?

  • 7.1.3 Have all operatives carrying out the works had specific confined space training?

  • 7.1.4 Has air monitoring been carried out?

7.2 DEMOLITION

  • Are there any demolition works being carried out?

  • 7.2.1 Is a specific demolition RAMS available on site and there is evidence it has been briefed to relevant personnel?

  • Guidance

  • Control measures to be included in demo RAMS:
    - method of preventing premature collapse;
    - safe removal of debris;
    - details of existing services and safe procedure of disconnection / protecting the remaining;
    - falling protection;
    - dust;
    - established exclusion zones.

  • 7.2.2 Is there evidence of competency of site personnel involved in demolition?

  • 7.2.3 Are exclusion zones established as per RAMS and maintained?

  • 7.2.4 Is there confirmation that all utilities have been disconnected / isolated?

  • 7.2.5 If any utilities remain, are they clearly labelled and protected to ensure they are not damaged during the work?

7.3 EXCAVATION & TRENCHING

  • Are there any excavation/trenching works being carried out?

  • 7.3.1 Is all necessary information in place & available, including utility plans, drawings & surveys?

  • 7.3.3 Has a Permit to Dig / Break Ground been issued and adhered to?

  • 7.3.4 Are CAT/Genny scans being carried out by a trained personnel using a calibrated scanner?

  • 7.3.5 Have services been clearly identified on the surface or in the excavation?

  • 7.3.7 Where needed, have the sides of the excavations been battered back or adequately supported?

  • 7.3.8 Is there a safe access / egress to and from excavation?

  • 7.3.9 Are there suitable control measures in place to protect personnel, materials and plant falling into excavation? (i.e edge protection, stop blocks)

7.4 LIFTING OPERATIONS & CONCRETE PUMPING

  • Are any lifting operations being carried out?

  • 7.4.1 Is a lifting plan in place and adhered to?

  • 7.4.2 Has the suitability of the ground conditions been checked?

  • 7.4.3 Have underground / overhead services been taken into account?

  • 7.4.4 Is lifting equipment suitable for the task? (i.e. special forklift attachment for lifting beams / columns)

  • 7.4.5 Have exclusion zones been set up as per lifting plan?

  • 7.4.6 Have RAMS been provided by the pump operator, including all relevant information regarding the pump e.g. boom limitations, outrigger details

  • 7.4.7 Are all pump inspection and testing records available & valid

7.5 PILING

  • Are there any piling operations being carried out?

  • 7.5.1 Have insurers been made aware?

  • 7.5.2 Has ground been investigated and all contaminants / underground services known?

  • 7.5.3 Is there a piling mat design available?

  • 7.5.4 Has the piling mat been tested?

  • 7.5.5 Is the area of work adequately cordoned off and only authorised personnel is allowed in the piling area?

7.6 PETROL FUELING STATIONS

  • Are works being carried out on a Petrol Fueling Station?

  • 7.6.1 Are the hazardous zones clearly identified at induction with a plan on display?

  • 7.6.2 Does the Site Manager (and ALL operatives working in hazard zones) have the SPA / UKPIA Passport?

  • 7.6.3 Are all tools being used in the hazardous zones 'explosion protected' and bearing the Ex symbol?

  • 7.6.4 Is a signed by both HBP and PFS Management Clearance Certificate available on site?

  • 7.6.5 Have all engines (except cars) been fitted with over speed protection (Chalwyn Valves)?

  • GUIDANCE

  • Chalwyn Valves provide Emergency Over-speed Shutdown Protection for engines in situations where a fuel source can be found in the ambient air. This is an uncontrolled fuel source which provides more fuel to the engine via the air intake, and in turn forces the engine to over-speed.

  • 7.6.6 Have all exhausts (except cars) been fitted with spark arrestors?

  • GUIDANCE

  • A spark arrester is any device which prevents the emission of flammable debris from combustion sources, such as internal combustion engines, fireplaces, and wood burning stoves. Spark arresters play a critical role in the prevention of fire and ignition of explosive atmospheres.

7.7. HOT WORKS

  • Are any hot works taking place?

  • 7.7.1 Has a hot work permit been issued and adhered to?

  • 7.7.2 Have all combustible materials been removed from the work area?

  • 7.7.3 Have all the penetrations within working area been covered to stop sparks spreading to different levels?

  • 7.7.4 Are all gas cylinders being used, transported and stored correctly? (LPG / Oxy-Acetylene / Refrigeration)

  • Guidance

  • LPG, Acetylene and Oxygen can be stored together in small quantities of up to 10 cylinders (total) provided storage is external, secure and ventilated. Hoses and torches are to be removed from cylinders and be stored in a separate, secure location overnight.

  • 7.7.5 If on-site welding operations are being carried out, are measures in place to protect workers & others on site (extraction, RPE, screens)

7.8 WORK AT HEIGHT (GENERAL)

  • Are there any works at height carried out?

  • 7.8.1 Is general hierarchy of fall prevention followed and collective means of fall protection are preferred where reasonably practicable?

  • 7.8.2 Has suitable edge protection been installed to prevent people / materials falling from height?

  • 7.8.3 Are all floor openings protected with robust, securely fixed and clearly marked covers which do not present a tripping hazard.

7.9 ROOF WORKS

  • Are any roof works taking place?

  • 7.9.1 Is there evidence of roof access being controlled? (i.e. access permit)

  • 7.9.2 Is there a safe and suitable means of access to the roof (secondary escape routes, rescue plans)?

  • 7.9.3 Have all fragile areas been identified and covered / barriered off?

  • 7.9.4 Is there means of raising the alarm on the roof?

7.10 SCAFFOLDING

  • Is there any scaffolding on site?

  • 7.10.1 Have ground conditions been checked prior to scaffold erection?

  • 7.10.2 Is there a TG20 compliance sheet and associated documentation available for the scaffolding?

  • 7.10.3 Have pull tests been carried out and recorded for anchor ties?

  • 7.10.4 Have reasonable steps been taken to prevent unauthorised access to scaffolding?

7.11 ELECTRICAL WORKS

  • Are electrical works taking place?

  • 7.11.1 Has an electrical permit been issued by PC and accepted by electrical contractor?

  • 7.11.2 Is isolation procedure (Lock out / Tag out) in place and followed when working on electrical systems?

  • 7.11.3 Are clearance (make dead) certificates available for any disconnected services?

  • 7.11.4 Are commissioning certificates available for any newly connected / reconnected services?

  • 7.11.5 Do all electrical contractors operatives hold a valid JIB ECS Card?

7.12 MMA FLOORING

  • Is MMA Resin Flooring being laid? (e.g. Flowcrete, Bolidt, Degafloor)

  • 7.12.1 Have all contractors and colleagues been excluded from the store?

  • 7.12.2 Has the operation been enclosed to prevent the escape of resin fumes?

  • 7.12.3 Are the fumes being extracted from the work area? Do contractor RAMS clearly show what extraction rates & fan size/configuration is needed?

  • 7.12.4 Are all flooring operatives wearing carbon filter masks (brown band)?

  • 7.12.5 Is air monitoring taking place?

7.13 TEMPORARY WORKS

TEMPORARY WORKS DOCUMENTATION

  • 7.13.2 Have TWC / TWS been appointed for the project and have they formally accepted the appointment?

  • 7.13.3 Is TWR up to date and completed correctly?

  • 7.13.4 Is there a Design or manufacturers guidance available for all TW items?

  • 7.13.5 Are permits to install / load / dismantle being used?

TEMPORARY WORKS INSTALLATION

  • 7.13.7 Are all TW items installed as per approved TW design & installation instructions?

TEMPORARY WORKS INSPECTIONS

  • 7.13.8 Are formal checks being carried out and recorded of all TW items ?

  • Guidance

  • This should include visual checks of all TW items carried out by the site manager and recorded on TW Inspection form (such as heras and hoarding). Scaffolding is subject to a 7 day inspection by competent person, recorded and kept on site, as well as displayed on a tag on the scaffolding. Formal sign off following scaffold erection should also be available, signed by site manager and scaffolder.

8. ENVIRONMENTAL

8. ENVIRONMENTAL

8.1 WASTE MANAGEMENT

  • 8.1.1 Is waste being segregated on site?

  • 8.1.1A Is segregated waste clearly signed?

  • 8.1.1B Is waste classification/WAC testing being carried out?

  • 8.1.2 Are waste transfer notes available and completed correctly?

  • 8.1.3 Is an OVERALL PROJECT percentage of recycled waste displayed on a Smart Start board in SM office (that includes subcontractors)?

  • 8.1.4 Is waste the compliance pack available electronically on site and all licenses / permits up to date?

  • 8.1.5 Is hazardous waste disposed of separately where required in the COSHH assessment?

8.2 FUEL STORAGE

  • 8.2.1 Is fuel being stored on site?

  • 8.2.2 Is a secondary containment system in place with plants such as generators and compressors to prevent leaks and spillages (i.e. double bund or plant nappies)?

  • 8.2.3 Are emergency spill kits available?

  • 8.24 Is fuel stored 10m away from drains & 50m away from watercourses such as wells or streams?

8.3 NUISANCE

  • 8.3.1 If there are noise/light/vibration restrictions on site are these being adhered to?

  • 8.3.2 Have any environmental complaints been made regarding works? Have these been followed up & closed out?

  • 8.3.3 Is dust (from stockpiles/demolition etc) being controlled to prevent it causing a nuisance

8.4 WATER MANAGEMENT

  • 8.4.1 Are water restrictions/limitations on site being adhered to?

  • 8.4.2 Are procedures in place to prevent run off/silt/other pollutants entering the water system

8.5 ECOLOGY

  • 8.5.1 Are ecological issues relevant to this site?

  • 8.5.2 Are ecological permits and restrictions being followed?

  • 8.5.3 Are measures in place to protect ecology?

Sign off

Additional comments and sign off

  • What are we doing well?

  • Site Manager's Comments

  • Site Manager's signature

  • Health & Safety signature

  • Date and time audit completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.