Information

  • Audit Title

SYSTEM OPTIONS

  • DOES WORK ORDER COINCIDE WITH RO SYSTEM AND PAPER WORK COMPLETED ? Take A Picture

  • ARE THERE ANY OPTIONS ON THE SYSTEM?

  • DOES THE SYSTEM REQUIRE PRIVATE LABELING? Take a picture

SYSTEM ELECTRICAL

  • SYSTEM VOLTAGE PHASE AND HERTZ

  • ARE ALL ELECTRICAL WIRES SECURED? TUG ON EACH WIRE.

  • DOES GROUND WIRE WORK (USE MULTIMETER) CHECK ON DIFFERENT LOCATIONS ON THE FRAME?

  • IS THE LOW PRESSURE SWITCH WIRED CORRECTLY? Take a picture

  • IS MOTOR WIRING CORRECT? Take a picture

  • IS THE CONTROLLER WIRED CORRECTLY?

  • IS THE HIGH PRESSURE SWITCH WIRED CORRECTLY? Take a picture

  • IS THE TANK FULL SWITCH WIRED CORRECTLY? Take q picture

  • IS THE POWER PLUG CORRECT?

  • IS THE CHEMICAL INJECTION OUTLET WIRED CORRECTLY? Take a picture

  • IS THE CHEMICAL INJECTION PLUG WIRED CORRECTLY? Take a picture

  • ARE THE WIRES THE CORRECT SIZE?

PLUMBING

  • ARE THE FLOW METER / GAUGES COINCIDENCE WITH THE WORK ORDER ? Take a picture

  • ARE ALL PVC UNIONS TIGHTENED?

  • IS THE CHECK VALVE GOING IN THE RIGHT DIRECTION?

  • ARE THE PVC PIPES GLUED? USE A RUBBER MALLET.

  • ARE THE NEDDLE VALVES GOING THE RIGHT DIRECTION?

PRE QC SIGN OFF

  • PRE QC PICTURES

  • ASSEMBLER

  • QC TECH

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.