Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

PROJECT:

  • Location

  • Jobsite

  • Client

VERIFICATION:

  • Construction drawings approved for use

  • DRW

  • REV

PIPEWORK

  • Pipe work installed as per drawing

  • Material approved for use

  • Material Brand

  • Pipe Bracketed as required

  • Pipe labels fitted as required

OUTLETS

  • 1. All outlets installed

  • 2. Outlets and control valves installed at correct height

FINAL CHECKS

  • 1. copper Pipe work not touching metal frames

  • 2. All pipe work fastened and secured correctly

  • 3. Pressure tested and checked for leaks

  • 4. Test pressure KPA

SIGN OFF

  • INSTALLED BY:

  • CHECKED BY:

  • SIGNATURE:

  • DATE:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.