Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
PROJECT:
-
Location
-
Jobsite
-
Client
VERIFICATION:
-
Construction drawings approved for use
-
DRW
-
REV
PIPEWORK
-
Pipe work installed as per drawing
-
Material approved for use
-
Material Brand
-
Pipe Bracketed as required
-
Pipe labels fitted as required
OUTLETS
-
1. All outlets installed
-
2. Outlets and control valves installed at correct height
FINAL CHECKS
-
1. copper Pipe work not touching metal frames
-
2. All pipe work fastened and secured correctly
-
3. Pressure tested and checked for leaks
-
4. Test pressure KPA
SIGN OFF
-
INSTALLED BY:
-
CHECKED BY:
-
SIGNATURE:
-
DATE: