Title Page
-
Work Activity
-
Work Location
-
Assessment Team
-
Conducted on
-
Date Reviewed
SECTION A
-
I have read and reviewed Risks, Hazards and Safety Measures for each task.
PPE
-
Select all PPE items that will be used
- Hand Protection
- Hearing Protection
- Hard Hat
- Respiration Equipment
- High Visibility Clothing
- Protective Safety Footwear
- Safety Harness
- Sun Protection
- Eye Protection
- Overalls
- Wet Weather Gear
- Others
-
Hand Protection
-
Hearing Protection
-
Hard Hat
-
Respiration Equipment
-
High Visibility
-
Protective Safety Footwear
-
Safety Harness
-
Sun Protection
-
Eye Protection
-
Overalls
-
Wet Weather Gear
-
Others: Please specify
SECTION B
IDENTIFIED HIGH RISK CONSTRUCTION CARRIED OUT IN THIS ACTIVITY
-
1. Involving a risk of a person falling more than 2 metres
-
2. On a telecommunication tower
-
3. Involving demolition of an element of a structure that is load-bearing or otherwise related to the physical integrity of the structure,
-
4. involving, or is likely to involve, the disturbance of asbestos
-
5. involving structural alterations or repairs that require temporary support to prevent collapse
-
6. In or near a confined space
-
7. In or near (i) a shaft or trench with an excavated depth greater than 1.5 metres, or (ii) a tunnel
-
8. Involving the use of explosives, or (i) is carried out on or near pressurised gas distribution mains or piping
-
9. On or near chemical, fuel or refrigerant lines
-
10. On or near energised electrical installations or services
-
11. Involving tilt-up or precast concrete
-
12. In an area that may have a contaminated or flammable atmosphere
-
13. On, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians
-
14. In an area at a workplace in which there is any movement of powered mobile plant
-
15. In an area in which there are artificial extremes of temperature
-
16. In or near water or other liquid that involves a risk of drowning
-
Where any of the above high risk work activities are carried out in construction work, they must be clearly identified in the Tasks column on the Work Method pro-forma
SECTION C
-
1. List training required eg Scaffold, Dogman, Front-end loader, Skid steer etc
- Site Induction
- Construction white card
- Manual Handling
- Electrical Awareness
- Traffic Control
- Working at heights
- Other
-
Others : Please specify
-
Engineering Certificates /Permits/Approvals required for this Activity: eg utility shutdown, hot work permit, etc.
Risk Assessment Priority Table
City of Ryde - Risk Assessment / HSE Work Method – Sign Off
- Personnel
-
Name and Signature
-
Organisation
-
Inducting Supervisor