Title Page

  • Work Activity

  • Work Location

  • Assessment Team

  • Conducted on

  • Date Reviewed

SECTION A

  • Screen Shot 2020-08-17 at 1.34.57 PM.png
  • Screen Shot 2020-08-17 at 1.35.46 PM.png
  • Screen Shot 2020-08-17 at 1.36.29 PM.png
  • Screen Shot 2020-08-17 at 1.37.32 PM.png
  • I have read and reviewed Risks, Hazards and Safety Measures for each task.

PPE

  • Select all PPE items that will be used

  • Hand Protection

    Hand Protection.png
  • Hearing Protection

    Hearing.png
  • Hard Hat

    hard hat.png
  • Respiration Equipment

    resp.gif.png
  • High Visibility

    Picture1.png
  • Protective Safety Footwear

    footwear.png
  • Safety Harness

    harness.png
  • Sun Protection

    sunpro.png
  • Eye Protection

    eye.png
  • Overalls

    overall.png
  • Wet Weather Gear

    wet.png
  • Others: Please specify

SECTION B

IDENTIFIED HIGH RISK CONSTRUCTION CARRIED OUT IN THIS ACTIVITY

  • 1. Involving a risk of a person falling more than 2 metres

  • 2. On a telecommunication tower

  • 3. Involving demolition of an element of a structure that is load-bearing or otherwise related to the physical integrity of the structure,

  • 4. involving, or is likely to involve, the disturbance of asbestos

  • 5. involving structural alterations or repairs that require temporary support to prevent collapse

  • 6. In or near a confined space

  • 7. In or near (i) a shaft or trench with an excavated depth greater than 1.5 metres, or (ii) a tunnel

  • 8. Involving the use of explosives, or (i) is carried out on or near pressurised gas distribution mains or piping

  • 9. On or near chemical, fuel or refrigerant lines

  • 10. On or near energised electrical installations or services

  • 11. Involving tilt-up or precast concrete

  • 12. In an area that may have a contaminated or flammable atmosphere

  • 13. On, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians

  • 14. In an area at a workplace in which there is any movement of powered mobile plant

  • 15. In an area in which there are artificial extremes of temperature

  • 16. In or near water or other liquid that involves a risk of drowning

  • Where any of the above high risk work activities are carried out in construction work, they must be clearly identified in the Tasks column on the Work Method pro-forma

SECTION C

  • 1. List training required eg Scaffold, Dogman, Front-end loader, Skid steer etc

  • Others : Please specify

  • Engineering Certificates /Permits/Approvals required for this Activity: eg utility shutdown, hot work permit, etc.

Risk Assessment Priority Table

  • Screen Shot 2020-08-17 at 6.21.38 PM.png
  • Screen Shot 2020-08-17 at 6.23.14 PM.png

City of Ryde - Risk Assessment / HSE Work Method – Sign Off

    Personnel
  • Name and Signature

  • Organisation

  • Inducting Supervisor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.