Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

Audit team

Audit team leader:

    Title:
  • Name:

  • ID:

  • Signature

Audit team:

    Title:
  • Name:

  • ID:

  • Signature

Assets under inspection:

Physical status

Physical structure.

Valve status

  • Status of main valve1.

  • Problem

  • Status of main valve 2.

  • Problem

  • Status of main valve 3.

  • Problem

  • Status of upstream valve 711 .

  • Problem

  • Status of downstream valve 711.

  • Problem

  • Status of upstream valve 712.

  • Problem

  • Status of downstream valve 712.

  • Problem

  • Status of upstream valve 713.

  • Problem

  • Status of downstream valve 713.

  • Problem

  • Status of bypass valve 711.

  • Problem

  • Status of bypass valve 712.

  • Problem

  • Status of bypass valve 713.

  • Problem

Water motor alarm.

  • Status of water motor alarm.

  • Problem

Automatic system

Automatic control system.

Delay time.

  • Delay time of D.V. of V-711.

  • OpeningTime:

  • Delay time of D.V. of V-712.

  • OpeningTime:

  • Delay time of D.V. of V-713.

  • OpeningTime:

Confirmation and detection

Pressure switches

  • Pressure switches run specifically:

  • Problem description

  • P.S.L of D.V if V-711 on setting:

  • Pressure setting:

  • P.S.L of D.V if V-712 on setting:

  • Pressure setting:

  • P.S.L of D.V if V-713 on setting:

  • Pressure setting:

  • P.S.H of D.V if V-711 on setting:

  • Pressure setting:

  • P.S.H of D.V if V-712 on setting:

  • Pressure setting:

  • P.S.H of D.V if V-713 on setting:

  • Pressure setting:

Compressed line:

Compressed pipe lines status:

Deluge valve of V-711:

  • Pipe line status:

  • Position of problem:

  • Pipe line
  • Position

  • Add media

Deluge valve of V-712:

  • Pipe line status:

  • Position of problem:

  • Pipe line
  • Position

  • Add media

Deluge valve of V-713:

  • Pipe line status:

  • Position of problem:

  • Pipe line
  • Position

  • Add media

Quartizoid bulb status:

Deluge valve of V-711:

  • Quartizoid status:

  • Position of problem:

  • Quartizoid bulb
  • Position

  • Image

Deluge valve of V-712:

  • Quartizoid bulb status:

  • Position of problem:

  • Quartizoid bulb
  • Position

  • Image

Deluge valve of V-713:

  • Quartizoid bulb status:

  • Position of problem:

  • Quartizoid bulb
  • Position

  • Image

Dry line:

Dry pipe lines status:

Deluge valve of V-711:

  • Pipe line status:

  • Position of problem:

  • Pipe line
  • Position

  • Add media

Deluge valve of V-712:

  • Pipe line status:

  • Position of problem:

  • Pipe line
  • Position

  • Add media

Deluge valve of V-713:

  • Pipe line status:

  • Position of problem:

  • Pipe line
  • Position

  • Add media

nozzles status:

Deluge valve of V-711:

  • nozzles status:

  • Position of problem:

  • nozzles
  • Position

  • Image

Deluge valve of V-712:

  • nozzles status:

  • Position of problem:

  • nozzles
  • Position

  • Image

Deluge valve of V-713:

  • nozzles status:

  • Position of problem:

  • nozzles
  • Position

  • Image

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.