Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Audit team
Audit team leader:
-
Title:
-
Name:
-
ID:
-
Signature
Audit team:
-
Title:
-
Name:
-
ID:
-
Signature
Assets under inspection:
Physical status
Physical structure.
Valve status
-
Status of main valve1.
-
Problem
-
Status of main valve 2.
-
Problem
-
Status of main valve 3.
-
Problem
-
Status of upstream valve 711 .
-
Problem
-
Status of downstream valve 711.
-
Problem
-
Status of upstream valve 712.
-
Problem
-
Status of downstream valve 712.
-
Problem
-
Status of upstream valve 713.
-
Problem
-
Status of downstream valve 713.
-
Problem
-
Status of bypass valve 711.
-
Problem
-
Status of bypass valve 712.
-
Problem
-
Status of bypass valve 713.
-
Problem
Water motor alarm.
-
Status of water motor alarm.
-
Problem
Automatic system
Automatic control system.
Delay time.
-
Delay time of D.V. of V-711.
-
OpeningTime:
-
Delay time of D.V. of V-712.
-
OpeningTime:
-
Delay time of D.V. of V-713.
-
OpeningTime:
Confirmation and detection
Pressure switches
-
Pressure switches run specifically:
-
Problem description
-
P.S.L of D.V if V-711 on setting:
-
Pressure setting:
-
P.S.L of D.V if V-712 on setting:
-
Pressure setting:
-
P.S.L of D.V if V-713 on setting:
-
Pressure setting:
-
P.S.H of D.V if V-711 on setting:
-
Pressure setting:
-
P.S.H of D.V if V-712 on setting:
-
Pressure setting:
-
P.S.H of D.V if V-713 on setting:
-
Pressure setting:
Compressed line:
Compressed pipe lines status:
Deluge valve of V-711:
-
Pipe line status:
-
Position of problem:
Pipe line
-
Position
-
Add media
Deluge valve of V-712:
-
Pipe line status:
-
Position of problem:
Pipe line
-
Position
-
Add media
Deluge valve of V-713:
-
Pipe line status:
-
Position of problem:
Pipe line
-
Position
-
Add media
Quartizoid bulb status:
Deluge valve of V-711:
-
Quartizoid status:
-
Position of problem:
Quartizoid bulb
-
Position
-
Image
Deluge valve of V-712:
-
Quartizoid bulb status:
-
Position of problem:
Quartizoid bulb
-
Position
-
Image
Deluge valve of V-713:
-
Quartizoid bulb status:
-
Position of problem:
Quartizoid bulb
-
Position
-
Image
Dry line:
Dry pipe lines status:
Deluge valve of V-711:
-
Pipe line status:
-
Position of problem:
Pipe line
-
Position
-
Add media
Deluge valve of V-712:
-
Pipe line status:
-
Position of problem:
Pipe line
-
Position
-
Add media
Deluge valve of V-713:
-
Pipe line status:
-
Position of problem:
Pipe line
-
Position
-
Add media
nozzles status:
Deluge valve of V-711:
-
nozzles status:
-
Position of problem:
nozzles
-
Position
-
Image
Deluge valve of V-712:
-
nozzles status:
-
Position of problem:
nozzles
-
Position
-
Image
Deluge valve of V-713:
-
nozzles status:
-
Position of problem:
nozzles
-
Position
-
Image