Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PROJECT DETAILS
-
Project
-
Project Number
-
Supplier
-
Sub-Contractor
-
Supplier Contact
-
Description Of Inspection
-
Inspection Engineer (Inspected By)
- Biju Kurian Pottayil
- Simon Rigg
- Lloyd
- Danny D
- Collin
- Clay
- Barry Ebert
DETAILS OF INSPECTION
-
Materials/Equipments Inspected :
-
Add media
-
CLB-SPE-M-029 Sec 4.4.8 - The Conveyor designed fully enclosed to contain dust and driven by electric gear motors. The Conveyors must be fitted with primary and secondary belt cleaners, Air supply failure detection system and underspeed detection instrumentation providing a minimum of two pulses per revolution. Conveyors must comply with AS1755 including all safety devises and guarding requirements. esign power requirements as per specification.
-
Standards/Specifications Applicable
-
Drawing Numbers Applicable
CAR DUMPER CD5C
-
BELT CONVEYOR MODEL : - Aerobelt Australia LB-400
-
Drive Motor: Contractor to complete and transmitt Appendix 2 of SKM-STD-E-010
-
Speed: 60m/min
-
Conveyor #1 Length/Incline: 350/0 m/deg
-
Belting: 2 Ply Quarryline
-
Scrapers: <br>Primary - HV 450<br>Secondary - UTC 450
-
Conveyor #1Power : 4 kW
SCREEN HOUSE SH5
-
BELT CONVEYOR MODEL : - Aerobelt Australia LB-400
-
Drive Motor: Contractor to complete and transmitt Appendix 2 of SKM-STD-E-010
-
Speed: 60m/min
-
Conveyor #1 Length/Incline: 350/0 m/deg
-
Belting: 2 Ply Quarryline
-
Scrapers: <br>Primary - HV 450<br>Secondary - UTC 450
-
Conveyor #1Power : 4 kW
INSPECTION/EXPEDITING DETAILS & COMMENTS
DOCUMENTATION STATUS
-
Contract Documents Available
-
ITP's Current Rev & Approval Status
-
Drawings Current & AFC
-
Manufacturing Schedules current Rev
-
Contractor's Procedure Available
RAW MATERIALS
-
All Materials Received
-
All Materials Stored correctly
-
All Material Certificates Received
INSPECTION & TEST STATUS
-
All Materials Conforming
-
NCR's Raised (NCR Numbers)
-
Non-Conforming item's disposition
-
Non-Conforming items identified & Segregated
IN-PROCESS INSPECTION & TEST STATUS
-
All materials inspected on receipt
-
ITP's progressively signed
-
ITP Hold & Witness Points attended
-
Inspection & Test Records verified
-
NDT by authorized personnel
-
Inspection, Measuring & Test Equipment calibrated
MANUFACTURING STATUS
-
All Work done safely
-
Resources available for completing job on time
-
SKM jobs prioritized to avoid any potential delays on contract
-
Appropriate number of personnel on job
-
Appropriate supervision on job
-
Progress in accordance with Schedule
-
Add media
-
Technical Queries recorded on Register
-
Technical Queries outstanding
-
ITP & MDR Status reflect current job status
HANDLING, STORAGE & PACKAGING
-
Materials and equipment are handled as per the contract requirement
-
Materials and equipment stored safely and in designated areas<br>
-
Packing and Protection in accordance with contract
TRANSPORT
-
Inspection Release Certificate completed and issued to Contractor and QA/QC Supt:
-
Consignment Note complete and accurate
-
IRC and Con Note affixed to goods/equipment
-
Goods/equipment marked in accordance with contract
-
Equipment loaded and secured on transport in accordance with contract
COMPONENTS/MATERIALS
-
Estimated overall Percent Complete
-
All Materials Ordered (No materials outstanding to be ordered)
-
All Materials Delivered to Contractors Facility
INSPECTION STAGE
-
Inspection Status
-
Inspection Engineer Signature
-
Signed On