Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Client Name:
-
Project Name:
-
Manufacturer & Material(s) Used:
-
Area(s) Completed:
Activity
-
Substrate inspected and accepted. Substrate must be clean, smooth, dry and free from dust or contaminants. All sharp points and loose materials have been removed. Are puddle flanges recessed and installed for membrane treatment.
-
Primer applied to relevant and manufacturers standards and application guide as per product data sheet & AS 3740-2021/4654.2:2012
-
Fillet reinforcing vertical & horizontal joints installed at AS standard 12mm cove and as per manufacturers product data sheet. Fillet reinforcement applied to vertical and horizontal construction joints and to puddle flange connection joint to concrete structural substrate.
-
Membrane installed to the correct micron thickness and as per manufacturers product data sheet AS 3740-2021/4654.2:2012
-
UV Membrane application as per manufacturers recommendation and in accordance with AS 3740-2021/4654.2:2012 (external use only).
-
Allow to cure. Flood test area to identify leaks. Flood testing must be at a minimum of 24 hrs. Repair as required.
Final Inspection
-
Client:
-
Name & Signature:
-
Date:
PWS - Primeseal Waterproofing Services
-
Signature:
-
Date: