Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Contractor name

Quality of work

  • Installed as per quote, design drawing and specification (unless variations/alterations arise)?

  • Boxes, Accessories, Panels and containment level?

  • Trunking, conduit, tray installed neatly and asper specification?

  • Cable containment and equipment securely fixed? Cables fixed every 300mm using metal supports where required?

  • Devices mounted in correct locations, heights and distances in line with relevant regulations?

  • Holes fire stopped?

  • As fitted drawings completed?

  • All system keys handed to responsible person?

  • Log book filled in of works completed

  • 230v cables segregated from 24v cables?

  • No exposed electrics and terminals left exposed/open?

  • Devices labelled where necessary (i.e Part 1 fire alarm devices)?

  • Terminations are tight, neat and no excess copper showing?

  • Electrical supply to Part 1 or AOV systems -<br>● Taken from as close as practicable to incoming mains?<br>● Not fed from a board likely to be isolated for mechanical maintenance i.e dedicated EML lighting board or lift fuse board?<br>● Correct size MCB, fuse or RCBO fitted for load and installation method?<br>● Circuit not on a common RCD?<br>● 30ma RCD protected if cables are buried<br>● Test/certification carried out and emailed to office or uploaded to easicert?<br>● Circuit labelled “Fire alarm do not switch off”?

  • Residents properties - Lighting/smoke circuit tested and uploaded to easicert. Minor works for additional equipment on a circuit?

  • GRADE D -<br>● Aico devices house coded together and tested?<br>● Aico (for use of alerting managers, call/care centre's) triggers the warden call? (THIS IS REQUIRED TO BE TESTED AND VERIFIED AS SOON AS THE INSTALLATION IN THE FLAT IS FINISHED. CHECK WITH THE CALL CENTRE “i.e. CENTRA” THE FLAT NUMBER IS CORRECT AND THEY RECEIVED A FIRE SIGNAL)?<br>● Circuit labelled “SMOKE DETECTORS”

  • Are third party contractors required? Connection of output devices to safety shutdowns (i.e. Lift engineer, Tunstall)

  • Emptied site and cleaned?

  • Zone chart fitted?

  • Making good complete as far as practicable?

  • Electrical test sheets complete?

  • As fitted drawings completed?

  • All keys and documents left in the documentation box or with responsible person?

  • Follow on work required emailed into installations?

Outstanding works, Status and Snagging

  • Areas checked during inspection?

  • Is the installation finished?

  • What is left to finish?

  • Work completed satisfactory standard?

  • List snags including location, materials required and photos

Scores - 1 = Very poor workmanship or Dangerous work. Needs urgent rectification, 2 = Sub standard work or items missed requires revisit from engineer, 3 = Installation complete to a satisfactory standard. 4 = Done to a high standard.

  • Installation quality

  • Making good quality

  • Documentation quality

Declaration

Sign off

  • I confirm all of the above checks have been completed. An adequate sample of the engineer/s on site’s work has been checked. Any items that have not been completed have been reported to the projects department.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.