Checking items/检查信息

  • Project<br>项目名称

  • Procedure<br>工序

  • Level 楼层

  • Panel No. 板块号

  • Checking Date 检查时间

  • Final inspection pass or fail<br>最终检查是否合格

  • QC Inspector 检查人员

Checking list/检查内容

    板块
  • Panel No. 板块号

  • 1.Setting Block Correctly Installed/No-Visible Defects<br>托块/位置正确、外观无缺陷

  • 2.The steel part model is correct, and the dimensions for installation are properly aligned.<br>钢件型号正确,进出尺寸安装到位

  • 3.Silicone injection is properly administered and positioned<br>硅胶施打及位置正确

  • 4.The panel is installed correctly according to the blueprint.<br>面板按图纸安装正确

  • 5.The types and installation positions of glass press plates are correct<br>玻璃压板种类及安装位置正确

  • 6. No visible scratch/damage<br>无可视划伤/损坏

  • 7. Is the panel installation qualified<br>面板安装完成是否合格,合格需拍一张整体照片

  • 8.Label<br>标签

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.