检查信息
-
Project/项目名称
-
Prcedure/工序
-
Level/楼层
-
Panel NO./板块号
-
Checking Date/检查时间
Check List/检查内容
- Panel/板块
-
Panel NO./板块编号
-
The material for aluminum profiles is correct/铝型材用料正确
-
Is the rubber strip used properly/胶条是否使用正确
-
The profile is clean, with no visible scratches or damage/型材清洁,无可视划伤/无损坏
-
T-profile bracket position, insertion and top spacing dimensions/T型挂件进出位、顶距尺寸
-
Is the steel saber insert core profile correctly installed on the left and right/钢利剑插芯型材左右是否安装正确
-
The protective film is applied according to the requirements/保护膜按要求粘贴
-
Fasteners are properly installed and sealed/紧固件安装正确/密封
-
The sealant is applied correctly, and excess sealant is wiped clean and neatly/用胶正确,余胶擦干净/整洁
-
Drains/vents are fabricated as per the blueprint/排水孔/漏气孔按图加工
-
Assembly height difference/corner unit angles, flatness (within 0.5mm), and step alignment meet the requirements/组装高低差/转角单元角度、平整度(0.5mm内)、错台符合要求
-
There is no significant color variation among the components/组件颜色无明显色差
-
dimensions of length and width/长宽尺寸( LENGTH/WIDTH <1m:±1.0mm;1-2m:±1.5mm;>2m:±2.0mm)
-
diagonal dimension/对角线 Diagonal ±2MM(<3M), ±3MM(≥3M)-需拍2张照片
-
module panel label/板块标签
inspection results/检查结果
-
Final inspection pass or fail/最终检查是否合格
-
checker/检查人员