Checking items/检查信息
-
Project<br>项目名称
-
Finished Product<br>成品
-
Level 楼层
-
Panel No. 板块编号
-
Date 检查时间
-
Is the inspection qualified?<br>最终验收是否合格
-
QC Inspector 检查人
Checking list/检查内容
- Panel/板块
-
Panel NO./板块编号
-
1. Is the assembly of the panel complete? You need to take two photos.单元板块是否完成组装?如果完成,需拍2张照片(标签照片+整体照片)
-
2.Are the dimensions of the panel correct?单元板的分格尺寸是否正确?
-
3.Are the hooks on the panel used correctly?单元板的挂码方向是否正确,类型是否正确?
-
4.Are the gasket around the panel complete and firmly attached?单元板的四周的胶条是否完整、牢固?
-
5. Is the glass surface no scratches?玻璃是否无划伤?
-
6. Is the surface gluing smooth, straight, and no residual glue on the panel?<br>面胶是否顺滑平直美观、胶宽均匀、面板无残胶?
-
7. Is the drainage hole unobstructed?排水孔是否通畅?
-
8. Is the installation of the corrugated board correct?成品保护瓦愣板粘贴是否牢固、位置正确?
-
9.Have the residual adhesive in the seam corners of the panel been cleaned up?(You need to take 4 photos)室内四角拼缝残胶是否清理干净?需拍每个角照片。
-
10. Is the electrostatic film applied smoothly and evenly?静电膜粘贴是否完整、平整?