Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

PROJECT:

  • Location

  • Jobsite

  • Client

VERIFICATION:

  • Construction drw approved for use

  • DRW

  • REV

INSTALLED

  • 1. Toilet, Cistern and seat

  • 2. Basin, mixer tap and waste pipe

  • 3. Grab rail, Shower hose and head

  • 4. Shower mixer cover plate and handle

FINAL CHECKS:

  • 1. All fixtures connected to water supply

  • 2. All connections checked for leaks

  • 3. Air raiders and restrictors clean and free of debris

  • 4. All waste connections checked for leaks and debris

  • 5. All rubbish removed and placed in bins

  • 6. TMV temperature set

SIGN OFF

  • CHECKED BY:

  • SIGNATURE:

  • DATE:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.