Title Page
-
Customer
-
Conducted on
-
Prepared by
-
Location
-
What measures are being installed
- ASHP
- Solar/Battery Storage
- Boiler
- ASHP, Solar/Battery Storage
- EWI,IWI,CWI,LI
- Other
General Site Conditions
-
Lead Engineer
-
Are Vehicles Parked safely
-
Is "Men at Work" sign visible
-
Is fire extinguisher present and in date
-
Are floor coverings correct
-
Are any materials stored safely
-
Are operatives wearing correct PPE
-
Is First Aid kit available and in date
-
Is house keeping to standards
Plant & Equipment
-
Is Work at Height equipment safe and in good condition
-
Is the Inspection tag visible and in date
-
Is all electrical equipment PAT tested
-
Are hand tools suitable for the task intended
Scaffolding
-
Is Scaff Tag visible and in date
-
Are ladders secured or locked off
-
Are kick boards fitted
-
Are hand rails fitted
-
Is edge protection correctly located
-
Are feet/plates in place
-
Is low level protection foam fitted
Notes
-
Is the site issue free
-
Additional Information
Signatures
-
Inspector
-
Lead Engineer
Actions
-
Any actions to report