Information
-
Document No.
-
Audit Site
-
Audit/Project Title
-
Conducted on
-
Prepared by
-
Location
Inductions
-
Have all required Inductions been undertaken
- Principle Induction
- Bass general Induction
- Bass site specific. Induction
- Transelect General Induction
- Transelect Site Specific Induction
- Datatech General Induction
- Datatech Site Specific Induction
-
Comments and copy of Inductions
-
Do all employees, subcontractors and labour hire staff have the relevant - qualifications, licences and certifications for the work that they are undertaking
Documentation
-
Is there a site safety folder and have all the responsibilities been signed
-
What mechanism of consultation has been undertaken on site. Attach copy's if available
- Pre start
- tool box talk
- already copied
- Principle contractors
- Bass
- Transelect
- Datatech
-
Who was involved in the consultation
- Principle Contractor
- Bass personnel
- Transelect Personnel
- Datatech Personnel
- Labour hire
- Sub contractor
-
Review sign on sheet and compare to the tool box/pre start sheet to ensure that all persons have been represented.
-
Are the electrical test and tag/plant and equipment registers completed and up to date
-
Is the evidence that the site supervision has checked the work hours to ensure compliance for fatigue assessment.
-
If work hours have been excessive has a fatigue assessment form been completed and submitted to the appropriate person.
-
Employee training register complete for those undertaking work on site.
-
Is the PPE register complete
-
Has a monthly motor vehicle checklist been completed on all motor vehicles on site.
Risk Assessment /SWMS / Permits
-
Is there a documented risk assessment on site identifying all the hazards associated with the work.
-
Safe Work Method Statements available on site and relevant to the works being undertaken and identifies the arenas of high risk work.
-
Have all relevant work permits been obtained
-
Has a separate isolations SWMS been completed for the task
Hazardous Materials.
-
Hazardous material register complete
-
SDS available and in date
-
Substances stored appropriately
-
Appropriate Spill kits available for the substances on hand
-
Have workers received level of training for the substances being used
Site Evaluation
-
Is Emergency equipment required, on hand and rescue plan developed.
-
All ladders have been inspected prior to use and at least monthly and recorded in the plant and equipment register.
-
Ladders and scaffold fit for task and being used in accordance with the SWMS and or COP
-
Is there height safety equipment on site and has it been checked prior to use and current test and tag?
-
Is the area suitability barricaded, warning signs erected, pedestrian and traffic controls in place.
-
Is PPE for the task being utilised appropriately.
-
House keeping satisfactory - leads off the floor, clean and tidy, waste in appropriate bins
-
First aid facilities on site adequate.
-
Fire fighting equipment available.
-
Are manual handling tasks being evaluated and controlled.
-
Is lighting fit for task.
-
Emergency assembly point identified.
-
Local medical centre/ nearest hospital identified and communicated to all on site. Are details readily accessible in case of an emergency.
-
Have environmental hazards been addressed.
-
Adequate supervision available.
-
Is there means of communication accessible for emergencies.
-
Bush fire Management plan available and discussed (where applicable)
-
Is there a Low Voltage rescue kit on site and has it been inspected.
Quality Assurance.
-
Has a drawing register been established and completed
-
Are drawings stamped for construction.
-
Are purchase orders completed correctly and delivery documents attached
-
Are all documents up to date, completed correctly and latest version
-
Inspection test plan in place.
-
Inspection and test checklist are in use.
Subcontractor.
-
Subcontractor being assessed.
-
For the subcontractor on site has the subcontractor evaluation been undertaken.
-
Is the subcontractor approved for the works onsite.
-
Are copies of their current insurances available on site.
-
Do all the employees of the subcontractor have appropriate / required PPE for site.
-
Are all persons working for the subcontractor direct employees of the subcontractor.
-
Has the subcontractor reviewed the Company's SMP, SOP, Policies, SDS, Site safety rules, and are aware of the scope of work.
-
Has the subcontractor reviewed/ been part of the latest tool box meeting and or pre start undertaken on site.
-
Or has the subcontractor undertaken their own consultation arrangements. Signatures are required to indicate attendence.
-
Has the subcontractor undertaken site specific risk assessment and produced a SWMS for the works being undertaken.
-
DBYD - are they required, are they current and on site for reference.
-
Appropriate Spill kit available for substances on hand.
-
Has the safety equipment been inspected prior to use.
-
When using an excavator, does the subcontractor understand the requirements on the use of the quick hitch.
-
When working near energised electrical systems is the subcontractor aware of safe operating distances
-
Are electrical test and tag / plant and equipment registers completed and up to date.
-
Does the subcontractor have appropriate first aid kit and fire extinguishers for the works being undertaken.
-
Subcontractor Representative /supervisor Signeture.
Plant and Equipment.
-
Safety checks complete ( including all safety devices fitted and operating / utilised correctly )
-
Maintenance and usage register complete (eg log books)
-
Is the operator licensed/competent to operate the plant and or equipment.
-
All compliance plates legible, in plain English and in metric.
Working at Heights.
-
All persons have been appropriately trained in the use of the height safety equipment.
-
Height safety equipment inspections are up to date and appear on the plant and equipment inspection registers.
-
Appropriate rescue equipment available on site for the works being undertaken.
-
Appropriate anchor points have been selected for the attachment of working at heights equipment.
-
All installed anchor points have evidence of current inspections.
-
All ladders have been inspected prior to use at least monthly and recorded in the plant and equipment register.
-
Has all scaffold supplied been erected by a suitably competent (trained) person and or licences where required.
Traffic management.
-
Is the on site traffic manage being undertaken by an accredited company who has been assessed and approved o undertake works.
-
Does the onsite traffic management have an appropriate, traffic management plan and or traffic control.
-
Is a road occupancy licence required and current for the works being undertaken.
-
Do all employees of the traffic management organisation have appropriate licences on hand.
-
Types of traffic management Qualifications.
- Traffic Controller
- Apply Traffic Control Planx
- Select/Modify Traffic Control Plans
- Design and Inspect Traffic control Plans
-
Have all signs and devices been applied as per TCP and or TMP.
-
Has provision been made for any intersections, on-loading or off-loading ramps within the worksite
-
Has provision been made for these vehicles
-
Will vehicles be entering or leaving the worksite from private or commercial driveways?
-
Is there adequate site distance for road users to sins and traffic controllers?
-
Will control measures be safe for the approach speeds of traffic?
-
Has consideration been given to traffic volumes expected?
-
Has provision been made for bus stops including schools
-
Has provision been made for pedestrians including those with impairments?
-
Has provision been made for cyclists?
-
Are there any overhead power lines that might be a risk to construction vehicles and plant?
-
Hs the time of day been adequately considered?
Excavation.
-
Are they an approved subcontractor
-
Are risk assessments and SWMS required and completed for work being undertaken.
-
Are the required documents on site and current and relevant.
-
Are DBYD on set and current.
-
Has there been confirmation of the location of underground services and is pot holing required and undertaken.
-
Is there a potential for gases to be present and are fire extinguishers available and or on site.
-
When using an excavator, does the operator understand the requirements on the use of the quick hitch.
-
Is signage and of barricading required and in position.
-
Are all persons in the work area wearing high visibility clothing and hat hats
-
Is the trench deeper than 1.5 metres or has the soil been previously disturbed, running sand or saturated soils.
-
Does the trench required benching, battering or shoring if yes then has this been correctly installed.
-
Is the spoil pile a minimum 1 metre from the edge of the trench.
-
Is the safety observer required and in position and wearing PE.
Confined Spaces.
-
Hs a risk assessment been carried out.
-
Has an entry permit been completed and used correctly.
-
Has the gas detector received a pre operational check(bump test)
-
Are all personnel working on or in the confined space trained and current.
-
Has all the confined space been gas detected.
-
Does the area kneed barricading.
-
Hs a rescue plan been developed and the correct equipment on hand and available for use.
Environmental
-
Have all environmental hazards been addressed for this site.
-
What environmental control measures does the site have in place.
-
Are there appropriate spill kits available for the substances being used.
Summary.
-
Comments.
-
Recommendations.
-
General Photos.
Signatures.
-
Name
-
Name