Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Inductions

  • Climatech inductions completed <br>

  • Principal contractor induction completed

  • Sub contractor evaluation completed (HSF-036)

  • Have daily per-starts been completed (HSF-015)

  • Inductions rating as per viewed documentation

Registers

  • Skills register complete and up to date (HRF-006)

  • Is the PPE register complete

  • Plant and equipment registers completed (HSF-101)

  • Electrical registers completed (HSF-058)

  • Registers rating on viewed documentation

General

  • Safe work method statements available and signed

  • Toolbox talks completed as per frequency required on site (HSF-014)

  • Emergency equipment on hand and rescue plan developed

  • General rating on viewed documentation

Hazardous Materials

  • Hazardous materials register complete (HSF-052)

  • MSDS's available and in date

  • Substances stored appropriately

  • Hazardous rating on viewed documentation

Site Evaluation

  • All isolations completed appropriately for work task

  • House keeping satisfactory - leads off floor, clean and tidy, waste in appropriate bins

  • First aid facilities on site are adequate

  • Fire fighting equipment available

  • Are manual handling tasks being evaluated and controlled

  • Is the area suitably barricaded, warning signs erected, pedestrian and traffic movements considered with controls in place

  • Lighting fit for task

  • Is all PPE for the task being utilized appropriately

  • Emergency assembly point identified

  • Has environmental hazards been addressed

  • Ladders and scaffolding fit for task and being used in accordance with swms / cop

  • Adequate site supervision available

  • Visual inspection rating of site conditions

Plant & Equipment

  • Safety checks complete

  • Maintenance and usage register complete

  • Operator qualified for use

  • Plant & equipment rating as per viewed documentation

Quality Assurance

  • Drawing register has been completed (ITC-1)

  • Inspection and test plan in place

  • Inspection and test checklist are in use

  • Quality rating as per viewed documentation and practices

Summary

  • Overall condition of the project

  • Comments

  • Recommendations

  • General Photo's

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.