Have all required inductions been undertaken
- Toolbox talk,
- Pre-start meeting,
- Site Safety Checklist,
- Principle Toolbox Talk / Pre- Start,
- On-Site Safety Committee,
-
Comments
-
Inductions rating as per viewed documentation
-
Do all employees, subcontractors and labour hire staff have the relevant - Qualifications, Licences and Certifications for the work that they are undertaking.
-
General rating on viewed documentation
Documentation
-
Is there a site safety folder on site and have all those with responsibilities signed off
-
Employee Training Register complete for those undertaking works on site
-
Is the PPE register complete
-
Are the Electrical Test and Tag / Plant and Equipment registers completed and up to date.
-
Registers rating on viewed documentation
-
What the mechanism of consultation have been undertaken on this site, Toolbox talks / Pre-Starts undertaken for all Bass Employees, sub contractors and labour hire personnel on site.
-
Review the sign on sheet and comparison to the toolbox talk sheet to ensure all persons have been represented.
-
General rating on viewed documentation
Risk Assessments / SWMS / Permits
-
I there a documented risk assessment on site identifying all the hazard associated with the works
-
Safe work method statements available on site and relevant to the works being undertaken and identifies the areas of high risk works.<br>
-
Have all relevant Work Permits been obtained
-
Has a separate isolations SWMS been completed for the task.
-
General rating on viewed documentation
Hazardous Materials
-
Hazardous materials register complete
-
SDS's available and in date
-
Substances stored appropriately
-
Appropriate Spills Kit available for the substances on hand.
-
Have workers received the appropriate level of training for the substances being used.
-
Hazardous rating on viewed documentation
Site Evaluation
-
Is Emergency equipment required, on hand and rescue plan developed
-
House keeping satisfactory - leads off floor, clean and tidy, waste in appropriate bins
-
First aid facilities on site are adequate
-
Fire fighting equipment available
-
Are manual handling tasks being evaluated and controlled
-
Is the area suitably barricaded, warning signs erected, pedestrian and traffic movements considered with controls in place
-
Is the lighting fit for task.
-
Is all PPE for the task being utilized appropriately
-
Emergency assembly point identified
-
Local medical centre / nearest hospital identified and communicated to all on site. Are details readily accessible encase of emergency.
-
Has environmental hazards been addressed
-
Ladders and scaffolding fit for task and being used in accordance with swms / cop
-
Adequate site supervision available
-
Is there a suitable means of communication accessible for emergencies
-
Visual inspection rating of site conditions
Subcontractor
-
Subcontractor being assessed
-
For the subcontractor on site has the subcontractor evaluation been undertaken
-
Is the subcontractor approved for the works on site
-
Are copies of their current insurances available on site
-
Do all employees of the subcontractor have the appropriate / required PPE for site.
-
Are all persons working for the subcontractor direct employees of the subcontractor.
-
Has the subcontractor review the Bass SMP, SOP, Policies, SDS, Site Safe Rules and are aware of the scope of works.
-
Has the subcontractor reviewed / been part of the latest toolbox meeting and or Pre-Start undertaken on site or has the subcontractor undertaken their own consultation arrangements (signatures to indicate attendance)
-
Has the subcontractor undertaken a site specific risk assessment and produced a SWMS for the works being under taken.
-
DBYD - are they required, current, and on site for reference.
-
Appropriate Spills Kit available for the substances on hand.
-
Has the safety equipment been inspected prior to use.
-
When using an excavator, does the subcontractor understand the requirements on the use of the quick hitch.
-
When working near energised electrical systems is the subcontractor aware of the safe operating distances.
-
Are the Electrical Test and Tag / Plant and Equipment registers completed and up to date.
-
Does the subcontractor have an appropriate first aid kit and suitable fire extinguisher for the works being undertaken.
-
Subcontractor rating as per viewed documentation
-
Subcontractor Representative / Supervisor Signature
Plant & Equipment
-
Safety checks complete (including all safety devices fitted and operating / utilised correctly)
-
Maintenance and usage register complete ( eg log books )
-
Is the operator licences / competent to operate the plant and equipment.
-
Has the safety equipment been inspected prior to use.
-
All compliance plats are legible, in plain English, and metric.
-
Plant & equipment rating as per viewed documentation
Working at Heights
-
All persons have been appropriately trained in the use of the height safety equipment
-
Height safety equipment inspections are up to date, and appear on the plant and equipment inspection check sheet.
-
Appropriate rescue equipment available on site for the type of works being undertaken.
-
Appropriate anchor points have been selected for the attachment of working at heights equipment.
-
All installed anchor points have evidence of current inspections.
-
All ladders have been inspected prior to use and at least monthly and recorded in the plant and equipment register.
-
Has all scaffolding supplied been erected by a suitably competent (trained) person and or licenced where required.
-
Working at Heights rating as per viewed documentation and practices
Traffic Management
-
Is on site traffic management being undertaken by an accredited company who has been assessed and approved to undertake works.
-
Does the on site traffic management have the appropriate, traffic management plan and or traffic control plan.
-
Is a road occupancy licence required and current for the works being undertaken.
-
Do all the employees of the traffic management organisation have the appropriate licences on hand.
-
Have all signed and devices been applied as per TCP and or TMP.
-
Traffic Management rating as per viewed documentation and practices
Quality Assurance
-
Has a Drawing register has been established and completed.
-
Are the drawings stamped for construction
-
Inspection and test plan in place
-
Inspection and test checklist are in use
-
Quality rating as per viewed documentation and practices
Environmental
-
Have environmental hazards been addressed for this site
-
What environmental control measures does the site have in place.
-
Are there appropriate spills kits available for the for the substances being used.
Summary
-
Comments
-
Recommendations
-