Information
-
County
-
Project: 11/0160
-
Highway
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Station To Station
STATEMENT OF EQUIPMENT AND LABOR
STATEMENT OF EQUIPMENT AND LABOR
-
Equipment
-
Description
-
Hrs.
-
Rate
-
Amount
-
Total
Labor
-
Classification and Name
-
Hours
-
Reg.
-
O.T.
-
Rate
-
Reg.
-
O.T.
-
Amount
-
Total
STATEMENT OF MATERIALS ACTUALLY PLACED THIS DATE
STATEMENT OF MATERIALS ACTUALLY PLACED THIS DATE
-
Materials
-
Description
-
Unit
-
Quantity
SIGNATURES
-
Contractor
-
Inspector
-
Area Engineer
-
Select date