Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
Name
-
Programme Area
-
Function
-
Description of Work
-
Office/ Site name
-
Date/ Time
-
PC Name
-
Contractor Representative
-
Is the Coss Holding the Form C
-
If no, stand works down and raise with NOM (Comments/Observations)
-
Is the COSS's Sentinel card endorsed with 'OLP' ? i.e. do they hold the correct competency to take a Form C ? (PTS/AC and test before touch)
-
If no, stand works down and raise with NOM (Comments/Observations)
-
Has the COSS signed the Form C to confirm they understand the arrangements ?
-
If no, stand works down and raise with NOM to rebrief (Comments/Observations)
-
Does the COSS know how to contact the "NOM"
-
If no, establish the reason why not ?
-
Does the COSS know where to return the C Form and test before touch document at the end of the shift?
-
If no, discuss with NOM
-
Does the COSS fully understand the limits of isolations on the Form C permit they are holding? Can they demonstrate/ describe physically where the limits are? Do they know where the nearest live electrical hazard is ?
-
If no, stand works down and discuss with NOM to rebrief
-
Does the Form C cover the full works for the shift including RRAP access ?
-
If no, stand works down and review arrangements (Comments/Observations)
-
Have all staff received a Form C brief from the COSS ?
-
If no, stand works down and review and identify why not
-
Does the team fully understand the lines and safe earthed working limits ?
-
If no, stand works down and review and identify why not (Comments/Observation)
-
Does the PIC and Supervisor for the works understand where the nearest live equipment is adjacent to site of work
-
If no, stand works down and review (Comments/Observations)
-
Was the test before touch completed prior to works commencing in this location?
-
Include where it was carried out - review test before touch document (Comments/Observations)
-
If no, why was the test before touch not completed ?
-
Are they in possession of test before touch document ?
-
If no, stand works down NOM to issue test before touch document
-
Do they understand method and is document completed properly ?
-
Was the test before touch completed prior to works commencing in this location
-
If yes where was it carried out- review test before touch document
-
If no, why not ?
-
Does the SWP include electrical hazards that state the electrical permit requirements? Detailed information isn't required in the TBS, this is documented on the Form C
-
Comments/Observations
-
If there is a permanent scaffold in place is this bonded ?
-
If not stop immediately and quarantine (Comments/Observations)
-
Are there OTP or off track plant in use and is a Machine Controller directing movements ?
-
Comments/Observations
-
If working close to the OLE or structures is jib restriction in use?
-
Comments/Observations
-
Are controls in place to avoid making contact with OLE or structure
-
Comments/Observations
-
Do any machines require Engineering Acceptance, if so has this been obtained ?
-
What does the EAC say about working under OHL ? (Comments/Observations)
-
Has the operator seen a copy of the Engineering, Acceptance certificate ?
-
Comments/Observations
-
Where is the RoLE demarcation (Comments/Observation)
-
What RoLE equipment is being used ?
-
Who is allowed to move/adjust RoLE equipment ?
-
Do you have any concerns ? (Comments/Observations)
-
Summary Comments or Observations
-
Summary of open actions and timescales for close out
-
Open actions- Responsible person- close out time (List)