Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel
1.0 - Previous inspection
-
1.1 - Has the last inspection been reviewed?
-
1.2 - Are there no outstanding actions?
2.0 - Lab Area
-
Lab clean ?
-
Reversion Room clean and tidy ?
-
Rig storage are clean and tidy ? Free from excessive rings ?
-
Lab water bath clear ? Temperature set to correct temp ?
-
Light fittings clean and in good condition?
-
Floor surfaces even and uncluttered?
-
Walkways adequately and clearly marked?
-
Guards in place and operating ? Check daily sign off sheet !
-
Housekeeping audits completed ? Check daily sign off sheet !
-
Tools not in use kept in place? Check and inspect shadow board !
-
No double adapters in use?
-
Portable equipment tested and tagged?
-
No broken plugs, sockets or switches?
-
No power leads across walkways?
-
No air leads across walkways?
-
No excessive rags or gloves laying around ?
-
No frayed or damaged leads?
2.0 - Tooling Area
-
Area clean ?
-
Hot tooling signs used for tooling on heat ?
-
Racking in good condition, all pallets locked into racking and all items above shoulder height strapped or wrapped to the pallet ?
-
Light fittings clean and in good condition?
-
Floor surfaces even and uncluttered?
-
Walkways adequately and clearly marked?
-
Is the area clear of rubbish?
-
No double adapters in use?
-
Portable equipment tested and tagged?
-
No power leads across walkways?
-
No air leads across walkways?
-
No frayed or damaged leads?
Sign off inspection
-
Team Leader
-
Manager
-
Safety Coordinator to sign off once all actions are completed.