Title Page

  • Site Work Order Number

  • Site Name

  • Date and Time

  • Location
  • Chainage From

  • Chainage To

  • Lot Number

  • Define Lot Size / Area of Pavement Layer - Must be maximum of 4000m2 or 1 Days Production. M2

  • Has the Area been physically marked out on the ground?

  • Photo of area marked prior to running rock

  • Has the crushed rock material docket been inspected?

  • Photo of Delivery Docket

  • Is the Rock being wheeled out per load?

  • Is the compacted depth at the correct design height and within + / - 8mm ? (Use surveyor, laser, string lines or GPS)

  • Has the crown and width been checked against offset pegs and within 50mm?

  • Is the pavement layer depth as per the design?

  • Show photo of crushed rock depth & measuring tape

  • What is the overall compaction result for this lot?

  • Has this Lot been Proof Rolled with a loaded Water Cart and what was the result?

  • Description and comments on failed or non proof rolled area(s). What treatments were used and what chainages?

  • NEMA Authorised Signature confirming the above is true and correct

  • Client / Superintendent / Other Signature agreeing the above is true and correct

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.