Title Page
-
Site ID
-
Conducted on
-
Prepared by
Location
-
Road Name
-
Road Number
-
RMC
-
Direction
-
MABC
-
MABC Number
-
Municipality
-
SRRS Start (m)
-
SRRS End (m)
-
KM Start (km)
-
KM End (km)
-
GPS Start
-
GPS End
-
General Location comments
Inspection - Existing
-
Existing surface
-
Other surface
-
Existing aggregate size
- 5
- 7
- 10
- 14
- 20
- 14/7
- 20/7
- Other
-
Other size
-
Extent of cracking
-
Extent of patching
-
Priority
-
Major Structures
Structure Number
-
Structure Number
-
Minor culverts
-
Mark on sketch and add to AMIS if not there
-
Pits and Valves
-
Mark on sketch
-
Kerb and Channel
-
Residential area
-
Businesses in vicinity
-
Farms in vicinity
-
Emergency facilities in vicinity
-
In town
Intersecting Roads
-
Mark on sketch
-
Intersecting Road?
-
Road Name
-
Location
-
Other assets / services
Proposed Treatment
-
Treatment
- Final Seal
- Reseal
- GRS
- Microsurfacing
- DGA Overlay
- SMA Overlay
- 200mm remove and replace
- 35-50mm remove and replace
- HPWT
- Grinding
- Rehabilitation
- Other (including combination treatments)
-
Other Treatment
-
Stone size
- 5
- 7
- 10
- 14
- 20
- 14/7
- 20/7
- Other
-
Other size
-
Binder
- C170
- C320
- A10E
- HSS
- XSS
- SAM
- SAMI
- Other
-
Other binder
-
Full name of treatment
-
Comments (including reasons for treatment selection, type of defects within site, etc)
-
Suction Sweeper (N if shoulders are unsealed or asphalt treatment)
-
2 attenuators (Y if on GV or Hume freeways)
-
Pre-Treatment
- None
- Dry Top
- Pre-Spray
-
Dry Top - Area (m2)
-
Pre-spray
- Diff Line
- Centre Line
- Edge Line
-
Area (m2)
Alternative Treatment
-
Treatment
- Final Seal
- Reseal
- GRS
- Microsurfacing
- DGA Overlay
- SMA Overlay
- 200mm remove and replace
- 35-50mm remove and replace
- HPWT
- Grinding
- Rehabilitation
- Other (including combination treatments)
-
Stone size
- 5
- 7
- 10
- 14
- 20
- 14/7
- 20/7
- Other
-
Binder
- C170
- C320
- A10E
- HSS
- XSS
- SAM
- SAMI
- Other
-
Full name of alternative treatment
-
Comments (including reasons for alternative treatment selection)
Site Elements
- Elements
-
Element
- L1 - Lane 1
- L2 - Lane 2
- PL - Passing Lane
- RS - Right Shoulder
- LS - Left Shoulder
- TS - Turn Slot
- LT - Left Turn
- RT - Right Turn
- B - Bell
- LWP - Left Wheel Path
- RWP - Right Wheel Path
- FW - Full Width
- CR - Centre of Road
- P - Path
- BWP - Between Wheel Path
-
Start Location
-
End Location
-
Start KM
-
End KM
-
Length (m)
-
Width (m)
-
Depth (m)
-
QTY
-
UOM
-
Comments
Preparation Works
- Preparation Works
-
Preparation required
- Crack sealing
- Digouts
- Regulations
- Edge Repair
- Potholes
- Vegetation
- Drainage
- Other
-
Extent
Site Considerations
-
Risks
- Power lines
- Sight distance
- Traffic movements
- Pedestrians
- Out ofhours work
- Traffic queuing causing flushing / plucking
- None
-
Other
-
Comms Required
- Letter drop
- VMS
- Paper
- Shire
- Emergency Services
- Real Time
- None
-
Comments
Stacksite
-
Stacksite No.
-
axim_ID
-
Location
-
Comments (including condition, size, etc)
Pavement Marking
-
Line Marking replacement
-
Paint (m)
-
Long Life (m)
-
Stripe (m)
-
Semi (m)
-
Double (m)
-
Single (m)
-
Edge 100 (m)
-
Edge 150 (m)
-
Tactile Edge (m)
-
Tactile Stripe (m)
-
Tactile Semi (m)
-
Tactile Double (m)
-
Centre L Black Tactile (m)
-
Edge L Black Tactile (m)
-
Continuity (m)
-
Give Way (m)
-
Stop (m)
-
Arrows (No.)
-
Chevrons (No.)
-
RRPM W (No.)
-
RRPM Y (No.)
-
RRPM R (No.)
-
RRPM G (No.)
-
Other
-
Tactile Replacement
-
Edge Line Length (m)
-
Centre Line length (m)
-
Comments
Condition Data (desktop validation - not for completion onsite)
-
RIPC Site
-
axim_ID
-
Ave. PCI
-
Texture Depth
-
% Cracking
-
Roughness
-
Rutting
-
Deflection
-
One-way AADT
-
Two-way AADT
-
EHV %
-
Growth rate
-
Year
-
Posted Speed
Site Photos
-
Add Images
Site Sketch
-
Site Sketch
-
Map Photo
Submit
-
Ready to submit
-
Sign here