Title Page
-
Site Work Order Number
-
Site Name
-
Date and Time
-
Location
-
Chainage From
-
Chainage To
-
Lot Number
-
Define Lot Size / Area of Stabilisation - Must be maximum of 4000m2 or 1 Days Production. (Enter Length x Width = Area)
-
Has the Area been physically marked out on the ground?
-
Photo of area marked prior to stabilisation
-
Has Material Docket Been inspected? (Lime / Cement / Bitumen / Other)
-
Photo of Delivery Docket
-
Are there any Longitudinal Joints in this lot?
-
Have they been overlapped by 300mm?
-
Type of Binder Used?
-
What Type of Binder was used?
-
Amount of Binder Kg/m2 or L/m2
-
Photo of Mat Test (Weight of Binder / m2) or other on site field test
-
Maximum Allowable Working Time is 4 Hours per patch. What was the start and finish Time of Each Stab Run / Patch?
-
Stabilisation Run
Stabilisation Run
-
Start Time of Stabilisation
-
Finish Time of Stabilisation
-
Was water free of impurities and added to the mix homogeneously?
-
Depth Of Stabilisation? (mm)
-
Photo of Stabilisation Depth Check
-
Has the Length and Width been checked against offset pegs and within tolerance?
-
What are the compaction results for this Lot?
-
Has this Lot been Proof Rolled with a loaded Water Cart and what was the result?
-
Description and comments on failed or non proof rolled area(s).
-
NEMA Authorised Signature confirming the above is true and correct
-
Client / Superintendent / Other Signature agreeing the above is true and correct