Information

  • JHH Southern Carpark Extension Environmental Inspection Checklist

  • B836-ENV-001 Env Insp Chklst

  • Revision A

  • July 2014

  • Date of Inspection

  • Weather Conditions

  • Inspected by

  • General Instructions
    Select Yes or No for each response. If an item is not applicable, select NA.
    If an action is identified and fixed on the spot, details are to be recorded in the Comments and Actions section along with any supporting photos
    If an item cannot be rectified immediately, the it will be recorded in the Action Plan, and signed off and dated when the rectification actions are completed

1.0 GENERAL

  • 1.1 Site in generally tidy condition

  • Add media

  • 1.2 All equipment, materials, etc contained within work area boundary

  • Add media

  • 1.3 Any signs of construction related disturbance outside of construction areas with exception of sedimentation control

  • Add media

  • 1.4 Have there been environmental topics discussed at Toolbox / Prestart meetings

  • Add media

  • 1.5 Are environmental inspections being carried out in accordance with CEMP ?

  • Add media

2.0 Soil and Erosion Control

  • 2.1 Are onsite activities causing erosion or deposition of soils beyond the site boundary

  • Add media

  • 2.2 Are erosion and sediments controls correctly installed as per erosion and sediment control plan ?

  • Add media

  • 2.3 Are stockpiles controlled, stabilised and maintained according to the erosion and sedimentation control plan ?

  • Add media

  • 2.4 Any signs of overflow from detention basin ?

  • Add media

  • 2.5 Is dirt being tracked onto adjacent public road ?

  • Add media

  • Is the rumble / cattle grid installed in the position as shown on the SEP and in good condition ?

  • Add media

  • 2.7 Are vehicles and machinery movements onsite currently restricted to the area of construction activities and their designated parking areas ? Refer to SEP.

  • Add media

3.0 Water Quality and Contamination

  • 3.1 Are dangerous good and hazardous materials stored in covered and bunded areas ?

  • Add media

  • 3.2 Are spill kits readily accessible in areas and fully stocked ?

  • Add media

  • 3.3 Are mini tankers conducting onsite refuelling of construction plant and have spill kits adjacent to refuelling areas ?

  • Add media

  • 3.4 Any obvious signed of spills, leaks etc throughout the site ?

  • Add media

  • 3.5 Are any dangerous goods or hazardous substances currently being stored near drains or waterways ?

  • Add media

4.0 Noise and Vibration (Const and Plant Items)

  • 4.1 Have all plant items been through initial pre start checks, PHA and have sticker on plant ?

  • Add media

  • 4.2 Have all plant items been through daily pre start checks (check log book)

  • Add media

  • 4.3 Noise monitoring up to date for plant / equipment where applicable ?

  • Add media

  • 4.4 Plant not in use - switched off ?

  • Add media

  • 4.5 Any noise complaints ?

  • Add media

  • 4.6 Is construction work being carried out within the designated site working hours (Mon-Fri 7am-6pm and Sat 8am-1pm)

  • Add media

5.0 Air Quality

  • 5.1 Dust suppression equipment readily available ?

  • Add media

  • 5.2 Any obvious signs of dust deposition outside areas ?

  • Add media

  • 5.3 Exposed dusty areas kept damp (where required)

  • Add media

6.0 Waste Management

  • 6.1 Waste receptacles accessible, clearly marked, lidded and covered when not in use ?

  • Add media

  • 6.2 Where possible, all recyclable material has been separated ?

  • Add media

  • 6.3 Have hazardous or contaminated material (if generated) been segregated from other waste streams and stored such that runoff does not come into contact with it ?

  • Add media

  • 6.4 Are waste facilities and locations set up according to SEP ?

  • Add media

  • 6.5 Is the concrete washout facility being utilised and in good condition ?

  • Add media

7.0 Flora and Fauna

  • 7.1 Has the site boundary surrounding all works been clearly delineated and kept to a minimum size required for effective and safe completion of works ?

  • Add media

  • 7.2 Is there damage to native vegetation beyond the construction zone (excluding silt fence installation)?

  • Add media

  • 7.3 Is there any evidence of noxious weed growth within the site ?

  • Add media

  • 7.4 Have the potential impacts to flora and fauna been minimised ?

  • Add media

8.0 Heritage Items

  • 8.1 Have any objects been found ?

  • Add media

  • 8.2 Has this been discussed at toolbox / pre starts ?

  • Add media

9.0 Access

  • 9.1 Access to private properties not obstructed (ie existing carpark and Ronald McDonald House)?

  • Add media

  • 9.2 Pedestrian routes adjacent to site not obstructed ?

  • Add media

10.0 Traffic Management Plan

  • 10.1 Are there any contradictory signs ?

  • Add media

  • 10.2 Are there any surplus signs, obstructing or distracting signs ?

  • Add media

  • 10.3 Are signs suitably placed ?

  • Add media

  • 10.4 Are signs and devices in place at appropriate times and removed or covered when not needed ?

  • Add media

  • 10.5 Have damaged signs been replaced as soon as practicable ?

  • Add media

  • 10.6 Is the travel path for vehicles maintained and clearly defined ?

  • Add media

  • 10.7 Have any anomalies or inconsistencies found in the Vehicle Management Plan been reported and issues rectified ?

  • Add media

11.0 Other

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.