Title Page
-
Conducted on
-
Prepared by
-
Location
-
JITB - W2 - Observation Checklist
JITB - W2 System & Test Events
-
Guest Service Job Aid - System
-
Assembly Job Aid - System
-
Fryer Job Aid - System
-
Prep Job Aid - System
Drive-Thru Mystery Shop
-
Received a genuine welcome within 5 seconds? If asked to hold, re-greeted in 15 seconds or less?
-
DT or Outside Order Taker provides warm, friendly greeting and hassle-free order taking?
-
Smart-Selling used effectively
-
Asked, "Do I have your order correct on the screen" at DT speaker (or verbally repeats order)
-
Warm and friendly re-greet at the window, with a smile and eye contact?
-
Payment handled correctly, and receipt was provided without asking for one?
-
Team Member communicates main contents of each bag?
-
Received a final 2-part thank you/farewell?
-
Window 2 products
-
Was the above standards met for products ordered
-
Hot AND fresh French Fries or Seasoned Curly Fries?
-
Correct ingredients are being used for the Spicy Cluck Sandwiches? (refer to the AJA)
-
Spicy Cluck and Blazin’ Sandwiches are served on a Brioche Bun, Good Good or Spicy Good Good sauce on TOP, BOTTOM bun, and sauce on TOP OF FILLET, Edge to Edge?
-
Tiny Taco Big Box has 25 Tiny Tacos served with 3 Dip Cups? Tiny Taco Big Box is properly closed with lid set below tabs?
-
Donut Holes are hot and sufficiently covered with Cinnamon Sugar? 4 shakes for 4 pieces? 8 shakes for 8 pieces?
-
Is the SOS standard met based on target times
-
Enter total Order to Delivery Time (OTD)
-
Enter total Order to Delivery Time (OTD)
Operations Excellence
-
Onion rings (for Deluxe builds use ONLY) are being held in ambient temperature rail for 1-hour max?
-
Brioche bun is properly defrosted (8 hours) and properly batch toasted?
-
Spicy fillets are hot & crispy? Held in a finger food basket (4 max.) no longer than 60 min and UHC pan have no metal cover to maintain crispiness? (Taste the fillet for temp. & crispiness)
-
Fryer Cook and Stage time
-
Grill Flat Cook and Stage time
-
Grill - Clamshell Cook and Stage time
-
New yellow lid for Cinnamon Sugar is being used?
-
New retrofit racks in place with correct temperature and time settings?
-
Holding units are maintaining proper temperature? (Upper 270°F, Lower 185°F)
-
Build to charts are updated and reflect new extended hold times?
-
Precooking is executed and reasonably matches amounts called out on build-to charts?
-
Team Members know how to read build-to charts?
-
PIC and Team Members know their “zero” items, communicate, and Stop & Drop when ordered?
-
Ingredients are discarded when hold times expire?
-
Oil meets visual and taste standards. (i.e. French fries and tacos)
-
Oil is skimmed as needed to remove debris? Vats in good working condition?
Shift Management
-
PIC actively leading the shift, Guest Expectation Travel Path is in use?
-
POP is current, free of air bubbles, in good condition?
-
Have all Team Members received certification of training completion in Jenius? Training poster up?
-
Team Members deployed effectively to handle current volume and meet guest, quality, and speed standards?
-
Comments and Recognition: