Introduction/Entry
-
Copy of the COC's located by the fire panel
Fire Protection Systems
-
1. Is a Service Provider regularly testing and maintaining the following components to the relevant Service Agreement and appropriate State legislation:
-
A - Portable Fire Extinguishers/Hose Reels/Hydrants
-
Photo of Date Stamp
-
2. Are Fire Cupboards (fire hose reel storage, etc) clean and free from stored materials and rubbish?
-
3. Are Portable Fire Extinguishers and Fire Hose Reels marked with a location and identification marker?
-
C - Fire Doors - all operating correctly and clear from obstructions?
-
D - Fire Alarm System - clear from isolations/faults?
-
E - Fire Sprinkler System
-
Is there a Block Plan for the sprinkler system located near pumps?
-
Are the fire sprinkler system log books on site and current?
-
Date of last service?
-
F - Early Warning Intercommunication System (EWIS)? Clear from faults/isolations?
-
G - Emergency Lighting & Exit Signs and list last test date?
-
When was the last 5 yearly hydrant test undertaken?
-
Date the last 5 yearly sensitivity test was conducted on the fire detection?
Emergency Management
-
Is the emergency evacuation plan clearly displayed in all areas?
-
Is the manual for Emergency Evacuation Procedures on site and viewed?
-
Are assembly areas allocated and understood?
-
When was the last evacuation practice drill carried out?
-
Are the means of escape paths and emergency exits clear?
Electrical (Common area equipment only)
-
Has the Thermographic Test of the switchboards been completed, and report viewed with no repairs?
-
Date when the last Thermoscan was completed
Hazardous Substances
-
Are there any hazardous materials or dangerous goods present on site? If so, estimate quantities.
-
Are the materials or goods stored correctly? Show photographic evidence.
-
Are Material Safety Data Sheets (MSDS) available for all dangerous goods?
-
Has a Asbestos Audit been completed for the site? If required a management plan established?
Property Risk Audit
-
Has a JLL Property Risk Audit been completed at the property in the past 12 months?
-
Has all high risk item identified from the Audit been addressed and completed?
-
Has a Plant Risk Assessment audit been carried out on site?
-
Has a Confined Space audit been carried out on site?
-
Are Confined Spaces secured to prevent unauthorised access on site?
-
Are Confined Spaces on site suitably labeled?
-
Are contractor who enter Confined Spaces on site utilising the JLL procedures?
Interior Environment
-
1. Are floors and surfaces in good condition? (Slips & Trips)
-
2. Are stairways and aisles kept clear and useable?
-
2. Are all falls greater than one meter, protected by a balustrade at least 900mm in height?
-
3. Are lighting levels satisfactory?
-
4. Is the general presentation and cleanliness satisfactory?
-
5. Are toilets clean and adequately stocked with supplies?
-
6. Are the common area kitchen/tea rooms clean?
-
9. Are vacant areas clean and presentable?
-
10. Are lifts clean, well lit and are the emergency phones operational?
-
Are the Lift Registration(s) current?
-
11. Are public facilities and large common areas (i.e food courts, etc) well presented?
-
Any Ceiling Tiles damaged? Estimate quantity
Exterior Environment
-
1. Are exterior walls, windows, gutters and surfaces clean and in good repair?
-
2. Are paths and external stairs in good condition?
-
3. Are parking areas clean & tidy?
-
4. Are driveways clear and free of hazards?
-
5. Are landscaped areas well presented & free from rubbish?
-
6. Are all Roller Doors in working order and no visible damage?
-
7. Any damaged bollards & fences/gates damaged?
-
Has any High Risk matters been completed?
-
7. Is the line marking & signage adequate in the car park area?
-
8. Are there any wooden pallets stored up against any buildings? If so ask tenants to relocate away from the buildings?
General
-
1. Are all restricted access areas locked?
Plant & Equipment
-
1. Are all access ladders and stairways in good condition?
-
If required, are the roof anchor points/lines been maintained in the past 12 months?
-
2. Are the lifts and escalators serviced frequently?
-
3. Does the car park/storage ventilation system appear to be working correctly?
-
4. Are ALL plant rooms neat and tidy, free from debris and trip hazards and locked?
-
5. Is the roof area free from debris and trip hazards?
-
7. Are the Sump Pump(s) been serviced in the past 12 months?
-
8. Has the back flow device been tested?
Other Hazards
-
Please make a note of any hazards not already identified in this report.
-
Add photo any hazards identified during site inspection.
Site improvements / Capital Works
-
Please list works to improve the site
-
Add media
General Comment
-
Any security breaches, accidents occurred since last inspection?
-
JLL Auditor:
-