Information
CONSTRUCTION SITE RISK ASSESSMENT 3 MONTHLY REVIEW.
-
Audit Title
-
Project No:
-
Project:
-
Construction Of:
-
Commencement Date:
-
Construction Period (approx):
-
Date Review Conducted on:
-
Conducted by:
-
Location
-
Site Manager/ Supervisor:
-
Project Manager:
Form: JMK-PP-10t. Revision: 2.
CONSTRUCTION SITE RISK ASSESSMENT 3 MONTHLY REVIEW. Form: JMK-PP10t. Revision: 2.
-
1. ALCOHOL & DRUGS
-
Ref: Manage WHS Risks COP 2011
-
Comments:
-
2. ASBESTOS
-
Ref: WHS Regulation, Chapter 8. How to Safely Remove Asbestos in the Workplace 2011.
-
Comments:
-
3. ATMOSPHERIC CONTAMINANTS (DUST & FUMES)
-
Ref: WHS Reg. S40, 49, 50.
-
Comments:
-
4. COMPRESSED AIR
-
Ref: WHS Act; S19, 20.
-
Comments:
-
5. CONCRETE CUTTING/ CORE DRILLING.
-
Ref: WHS Reg. Part 3.1 & 3.2 & How to Manage WHS Risks COP 2011.
-
Comments:
-
6. CONFINED SPACES.
-
Ref: WHS Reg. Part 4.3 & AS/NZS 2865
-
Comments:
-
7. CONSULTATION, COMMUNICATION, COOPERATION & COORDINATION
-
Ref: WHS Act Part 5. WHS Reg. S309 & WHS Consultation, Co-operation & Coordination COP 2011.
-
Comments:
-
8. CONSULTATION- PRE-START MEETINGS
-
Ref: WHS Act Part 5, WHS Reg. S309. & WHS Consultation, Co.operation & Coordination COP 2011.
-
Comments:
-
9. CONSULTATION - TOOLBOX SAFETY MEETINGS
-
Ref: WHS Act Part 5 Div 2.
-
Comments:
-
10. CRANES AND LIFTING APPLIANCES.
-
Ref: WHS Act, S 19, 20. WHS Reg. Part 4.5, Chapter 5. & Mobile Crane & Tower Crane COP 2006
-
Comments:
-
11. CRITICAL INJURY.
-
WHS First Aid COP.
-
Comments:
-
12. DEMOLITION
-
Ref: WHS Reg. Chapter 4, Part 4.6
-
Comments:
-
13. DESIGN SAFETY
-
Ref: WHS Reg. Part 6.2, Manage WHS Risks COP 2011.
-
Comments:
-
14. ELECTRICAL - PORTABLE SWITCHBOARDS
-
Ref: Qld Electrical Reg. S 87, AS/NZS 3012 Sect.2.3
-
Comments:
-
15. ELECTRICAL - SWITCHBOARDS
-
Ref: AS/NZS 3012
-
Comments:
-
16. ELECTRICAL - WORKING NEAR OVERHEAD POWERLINES
-
Ref: Qld Electrical Safety COP 2010 (Electrical Work & Working near Exposed Live Parts). Qld WHS Reg. 2011 S 40, Para(g)
-
Comments:
-
17. ELECTRICAL - SAFETY COMPLIANCE
-
Ref: Qld. Electrical Safety Reg. S 87. AS/NZS 3012, AS/NZS 3000, AS/NZS 3003.
-
Comments:
-
18. ELEVATING WORK PLATFORMS (EWP)
-
Ref: WHS Act, S 19, 20. WHS Reg. Ch 5 & Plant COP 2005.
-
Comments:
-
19. EMERGENCY RESPONSE & EVACUATION
-
Ref: Building Fire Safety Reg. 2008, Part 4. WHS Reg. S 40, 43, 48, 80.
-
Comments:
-
20. EXCAVATION WORK
-
Ref: WHS Reg. Chpt. 6 Part 6.3 Div 3. Inclusive. Qld Electrical Safety Reg. S 62A, 62C, 62D.
-
Comments:
-
21. EXPLOSIVE POWER TOOLS
-
Ref: WHS Plant COP 2005.
-
Comments:
-
22. EXPLOSIVES
-
Ref: Manage WHS Risks COP 2011
-
Comments:
-
23. FALSEWORK/ FORMWORK
-
Ref: WHS Reg. S 299, 315H & WHS Formwork COP 2006.
-
Comments:
-
24. FATIGUE MANAGEMENT
-
Ref: Qld. WHS Managing fatigue, a guide for workplaces.
-
Comments:
-
25. FIRE HAZARDS
-
Ref: WHS Reg. Part 3.2 Div 8, 9. Part 7.1 Div1.
-
Comments:
-
26. FIRE PREVENTION & PROTECTION
-
Ref: Building Fire Safety Reg. 2008, S 54. Welding Technology Institute of Australia H&S Welding Guide Chpt. 4 & 5, AS 1851:2005.
-
Comments:
-
27. FIRST AID
-
Ref: WHS First Aid COP, WHS Reg S 42, 314.
-
Comments:
-
28. FLAMMABLE LIQUIDS
-
Ref: WHS Reg. S 51 to 53 inclusive.
-
Comments:
-
29. HARASSMENTT
-
Ref: WHS COP for Prevention of Workplace Harassment.
-
Comments:
-
30. HAZARD REPORTING
-
Ref: WHS Act S. 28, WHS Reg. Chpt 3, Part 3.1, Manage WHS Risks COP 2011.
-
Comments:
-
31. HAZARDOUS CHEMICALS
-
Ref: WHS Reg. Chpt 7.
-
Comments:
-
32. HEAT STRESS
-
Ref: Manage WHS Risks COP 2011.
-
Comments:
-
33. HIGH RISK CONSTRUCTION WORK - SAFE WORK METHOD STATEMENTS
-
Ref: WHS Reg. S 291, 299 to 303 inclusive & 312.
-
Comments:
-
34. HIGH RISK WORK
-
Ref: Qld. WHS Reg. Part 4.5, Div 1. & Sch 3.
-
Comments:
-
35. HOISTS
-
WHS Act S 17, 19, 20, 21. WHS Reg. Chpt 5. AS1481.1 & AS1481.7
-
Comments:
-
36. HOT WORK
-
Ref: Welding Technology Institute of Australia H&S in Welding Chpt 4 & 5.
-
Comments:
-
37. INDUCTION - GENERAL SAFETY
-
Ref: WHS Reg. S 316 to 318, 326.
-
Comments:
-
38. INDUCTION - SITE
-
Ref: WHS Reg. S 314, Part 6.5 Div 1.
-
Comments:
-
39. INTERRUPTION TO SERVICES OR SAFETY CONDITIONS
-
Ref: WHS Reg. S 304, Manage WHS Manage Risks COP 2011. Electrical COP 2011, Electrical COP 2010, Electrical Work & Working near Exposed Live Parts.
-
Comments:
-
40. ISOLATION OF SERVICES
-
Ref: WHS Reg. S 304. WHS Plant COP 2005. Manage WHS Risk COP 2011. Qld Electrical Safety COP 2010 for Electrical Work & Working Near Exposed Live Parts.
-
Comments:
-
41. LABOUR HIRE
-
Ref: WHS Act S 7, 19, 20.
-
Comments:
-
42. LADDERS
-
Ref: WHS Act S 19, 20. WHS Reg. Part 6.3 Sub-Div 3.
-
Comments:
-
43. LIFTING GEAR
-
Ref: WHS Act S 19, 20. WHS Plant COP 2005.
-
Comments:
-
44. LIFTING, HANDLING AND STORING
-
Ref: WHS Plant COP 2005. Hazardous Manual Tasks COP 2011.
-
Comments:
-
45. LIGHTING
-
Ref: WHS Reg. S 41, 314(a). Managing the Work Environment & Facilities COP 2011. AS/NZS 1680.1 Interior & Workplace Lighting.
-
Comments:
-
46. MACHINERY
-
Ref: WHS Act, S 19, 20. WHS Reg. Chpt 5 & WHS Plant COP 2005.
-
Comments:
-
47. MANUAL TASKS
-
Ref: WHS Reg. S 60, 61. WHS Hazardous Manual Tasks COP 2011.
-
Comments:
-
48. MOBILE PLANT & EQUIPMENT
-
Ref: WHS Act S 19, 20, Part 4. WHS reg. Chpt 5 & WHS Plant COP 2005.
-
Comments:
-
49. MONITORING &REVIEWING OF SAFETY CONTROLS
-
Ref: WHS Reg. S 271, 299 & 388. Manage WHS Risks COP 2011.
-
Comments:
-
50. NOISE
-
Ref: WHS Reg. S 56 to 59. WHS Noise COP 2004.
-
Comments:
-
51. NOTIFICATION OF INCIDENTS
-
Ref: WHS Act, Part 3.
-
Comments:
-
52. OBSTRUCTIONS
-
Ref: Hazardous Manual Tasks COP 2011. Manage Risks COP 2011.
-
Comments:
-
53. PERMIT TO WORK
-
Ref: WHS Reg. S 67. JM Kelly Policy JMK-PP-10.
-
Comments:
-
54. PILING
-
Ref: WHS Reg. S 304, 305, 305A. QLD Electrical Safety Reg. S 62, 62A, 62C, 62D, 64, 64A. WHS Act S 19, 20.
-
Comments:
-
55. POWER HAND TOOLS
-
Ref: WHS Plant COP 2005. Qld Electrical Safety Reg. S 87.
-
Comments:
-
56. PROTECTIVE CLOTHING & EQUIPMENT (Includes PPE)
-
Ref: WHS Reg. S 44 to 47 inclusive, Manage WHS Risks COP 2011.
-
Comments:
-
57. PUBLIC SAFETY (INTERACTION WITH CLIENT/ OTHER ENTITY WORK AREA
-
Ref: WHS Act S 19, 29, 46.. WHS Reg. Part 3.1 & S 298.
-
Comments:
-
58. PURCHASING WHS GUIDELINES
-
Ref: Manage WHS Risks COP 2011, JM Kelly Project Builders Corporate Procedure JMK-CP-09.
-
Comments:
-
59. SAFETY COMMITTEE
-
Ref: WHS Act Part 5, Div 4.
-
Comments:
-
60. SAFETY PERFORMANCE REPORTING - PROJECT
-
Ref: Manage WHS Risks COP 2011.
-
Comments
-
61. SAFETY POLICIES & OPERATING PROCEDURES.
-
Ref: Manage WHS Risks COP 2011. Current WHS Legislation, COP's and other relevant WHS requirements & JM Kelly requirements.
-
Comments:
-
62. SAFETY REPRESENTATIVE
-
Ref: WHS Act, Part 5, Div 3.
-
Comments:
-
63. SAFETY SIGNAGE & NOTICES
-
Ref: WHS Reg. Manage WHS Risks COP 2011.
-
Comments:
-
64. SITE ACCESS and STORAGE
-
Ref: WHS Reg. S 53, 298, 314(g).
-
Comments:
-
65. SITE ACCESS ROUTES
-
Ref: WHS Reg. S 298. Manage WHS Risks COP 2011.
-
Comments:
-
66. SITE AMENITIES
-
Ref: WHS Reg. S 41, 315, Chpt 5 & Sch 5A.
-
Comments:
-
67. SITE TRAFFIC
-
Ref: WHS Reg. Part 3.1. No specific legislation.
-
Comments:
-
68. SUN EXPOSURE
-
Ref: Manage WHS Risks COP 2011. Managing the Work Environment & Facilities 2011.
-
Comments:
-
69. TRESTLE LADDERS & PLATFORMS
-
Ref: WHS Act, S 19, 20. WHS Reg. Part 6.3 Sub-Division 3.
-
Comments:
-
70. UNAUTHORISED ENTRY (SITE SECURITY)
-
Ref: WHS Reg. S 298.
-
Comments:
-
71. VISITOR CONTROL
-
Ref: WHS Act, S 20. WHS Reg. S 298.
-
Comments:
-
72. WASTE MANAGEMENT
-
Ref: WHS Managing the Work Environment & Facilities COP 2011.
-
Comments:
-
73. WORK AT HEIGHTS
-
Ref: WHS Reg. Part 6.3 Div. 4, Sub-Div. 2, 3...WHS Act S 19, 20.
-
Comments:
-
74. WORK AT HEIGHTS - FALL PROTECTION DEVICES
-
Ref: WHS eg. Part 3.1, S 39, 54, 55 & Part 4.4 S 315B to 315G inclusive. AS/NZS 1891.4 Industrial Fall-arrest systems, Selection, Use & Maintenance.
-
Comments:
-
75. WORK AT HEIGHTS - PERMIT
-
Ref: Manage WHS Risks COP 2011. Form JMK-PP19s.
-
Comments:
-
76. WORK AT HEIGHTS - ROOFWORK
-
Ref: WHS Reg. Part 6.3 Div 4, Sud-Div 2, 3... Part 6.4 Div 3. WHS Act, S 19, 20.
-
Comments:
-
77. WORK AT HEIGHTS - SCAFFOLD.
-
Ref: WHS Act, S 19, 20, & Part 4. WHS Reg. S 306P, 306Q & WHS Scaffold COP 2009.
-
Comments:
-
78. WORK AT HEIGHTS - SCAFFOLD (MOBILE)
-
Ref: WHS Act, S 19, 20 & Part 4. WHS Reg. S 306P & 306Q. Scaffold COP 2009.
-
Comments:
-
79. WORK AT HEIGHTS - STEEL ERECTION
-
Ref: WHS Reg. Part 6.3 Div 4, Sub-Div 2, 3. WHS Act S 19, 20. WHS Scaffold COP 2009. AS/NZS 1891.2 Industrial Fall arrest System &Devices, Horizontal Lifeline & Rail Systems.
-
Comments:
-
80. WORKPLACE VIOLENCE
-
Ref: WHS Act, S 19. Manage WHS Risks COP 2011.
-
Comments:
REPORT SENT TO:
-
Managing Director
-
Construction Manager
-
Management Services Officer
-
Other
-
Date Sent: