Information

  • Document No.

  • Audit Title:

  • Site Safety & Environmental Inspection.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Site Manager/ Foreperson:

  • Project Manager:

Form JMK-PP-10c. Revision: 10

1. ADMINISTRATION

  • 1. Signage at site in place and correct<br>

  • 2. WHS Management Plan available & signed by all parties.

  • WHS Management Plan - Revision No:

  • WHS Management Plan - Date:

  • 3. Company policies displayed.

  • 4. General construction industry induction- records available<br>

  • 5. Site specific safety inductions- conducted.<br>

  • 6. WHS Adviser has been appointed to the site.<br>

  • 7. WHS Representatives- have been elected on site.<br>

  • 8. Pre-start meetings - held before work starts and is documented.<br>

  • 9. Toolbox meetings conducted regularly<br>

  • 10. Toolbox meeting minutes distributed to onsite personnel.<br>

  • 11. Access to MANGO Action requests available.<br>

  • 12. Interrupt site services or Safety conditions Request (form JMK-PP-10f) been completed where services or safety conditions to an organisation may be affected by construction work activity.<br>

  • 13. Demolition work - Site services control guide (form JMK-PP-10e) has been completed prior to commencement.<br>

COMMENTS

  • Tap to enter information

2. EMERGENCY & FIRST AID

  • 1. Emergency evacuation procedures are in place<br>

  • 2. Names and contact details of emergency warden displayed.<br>

  • 3. Emergency facilities and equipment are adequate and maintained.

  • 3(i) Exit signs<br>

  • 3(ii) Alarms<br>

  • 3(iii) Equipment<br>

  • 3(iv) Paths of travel.<br>

  • 3(v) Fire extinguishers.<br>

  • 4. First Aid kit is available & location prominently displayed.<br>

  • 5. Name and contact details of first aider displayed<br>

  • 6. Incident report forms are available.

COMMENTS

  • Tap to enter information

3. WORK. ENVIRONMENT

  • 1. Warning signs - located at risk areas.<br><br>

  • 2. Amenities- available, adequate and maintained.<br>

  • 3. House keeping- controlled; paths of travel are clear.<br>

  • 4. PPE- being worn.<br>

  • 5. Site is adequately secured against unauthorized access.<br>

  • 6. There is sufficient lighting to allow to be conducted safely.<br>

  • 7. There is sufficient lighting in stairwells etc... to allow safe evacuation in an emergency.<br>

  • 8. There is adequate ventilation to enable workers to carry out work without H&S risk.<br>

  • 9. Working conditions are satisfactory (not working in extremes of heat or cold)

  • 10. Controls in place to ensure workers are not exposed to H&S risks when working in extremes of heat or cold.<br>

  • 11. Work is being carried out away from essential services.<br>

  • 12. Safety controls are in place to ensure persons performing work near or to essential services are not exposed to H&S risks.<br>

COMMENTS

  • Tap to enter information

4. PLANT

  • 1A<br>. Licences/ Competency evidence available

  • Cranes & hoist

  • Details:

  • Dogging<br>

  • Details:

  • Rigging<br>

  • Details:

  • Fork lift<br>

  • Details:

  • Scaffolding<br>

  • Details:

  • 11mtr Boom EWP.<br>

  • Details:

  • Concrete Boom.

  • Details:

  • 1B. Other plant and equipment

  • Skid steer.<br>

  • Details:

  • Excavator<br>

  • Details:

  • Dozer<br>

  • Details:

  • Backhoe<br>

  • Details:

  • Front-end loader.<br>

  • Details:

  • Scraper<br>

  • Details:

  • Road roller.<br>

  • Details:

  • 2. Register has been developed for the site.<br>

  • 3. Risk assessments have been conducted (form JMK-PP-08c)<br>

  • 4. Plant & equipment (other than hand tools) checked prior to use (form JMK-PP-10g)<br>

  • 5. Is regularly maintained.<br><br>

  • 6. Maintenance records are available.<br>

  • 7. Machinery guarding complies with relevant standards.<br>

COMMENTS

  • Tap to enter information

5. CHEMICALS

  • 1. Hazardous chemicals are stored on site.<br>

  • 2. Hazardous chemical storage is adequate.<br>

  • 3. Hazardous chemicals are stored correctly.<br>

  • 4. SDS's are available for hazardous chemicals.<br>

  • 5. Hazardous chemical register (form JMK-PP-10b) is available & up to date.<br>

  • 6. Hazardous chemicals Risk assessments have been done.<br>

COMMENTS

  • Tap to enter information

6. WORK METHOD. STATEMENTS

1. SWMS HAVE BEEN RECEIVED FOR & CHECKED using Form JMK-PP10a

  • Air-conditioning.

  • Checked

  • Asbestos removal

  • Checked

  • Brick/block laying

  • Checked

  • Concrete pumping

  • Checked

  • Concreting

  • Checked

  • Crane (mobile/ tower)

  • Checked

  • Demolition

  • Checked

  • Earthworks

  • Checked

  • Electrical

  • Checked

  • Elevators

  • Checked

  • Fire services

  • Checked

  • Formwork

  • Checked

  • Glass

  • Checked

  • Joinery

  • Checked

  • Painting

  • Checked

  • Piling

  • Checked

  • Plastering

  • Checked

  • Plumbing

  • Checked

  • Scaffolding

  • Checked

  • Steel fixing

  • Checked

  • Structural steel

  • Checked

  • Tiling

  • Checked

  • Water proofing

  • Checked

  • Other

  • Checked

  • Other

  • Checked

COMMENTS

  • Tap to enter information

7. HEIGHTS ACCESS & WORK

  • 1. Ladders extend 1.0mtrs above access & secured against movement.<br>

  • 2. Work at heights permits have been issued for persons using fall arrest/travel restraint harness and lanyard systems.<br>

  • 3. Harness & lanyard- 6 monthly inspection records available.<br>

COMMENTS

  • Tap to enter information

8. ELECTRICAL

  • 1. Permanent live wiring in the construction work area is clearly identified.<br>

  • 2. Temporary construction wiring is clearly identified.<br>

  • 3. R.C.D. protection being used.<br>

  • 4. Electrical equipment on site (leads, tools, RCD, epods, temp. switchdoards, ) have been tested and tagged in last 3 months.<br>

  • 5. Portable switch boxes (epods) are labelled showing number/feed.<br>

  • 6. Temporary switch boards (numbered, signage on door, door shut etc....)<br>

  • 7. Electrical leads protected against damage.<br>

COMMENTS

  • Tap to enter information

9. SCAFFOLDING

  • 1. Complies with the code of practice.<br>

  • 2. Hand-over certificate available on site.<br>

  • 3. Scafftags are attached to the scaffolding<br>

COMMENTS

  • Tap to enter information

10. EXCAVATION

  • 1. Excavation control guide (form JMK-PP-10d) has been completed and issued to excavator operator & crew prior to excavation work commencing.<br>

  • 2. Trenches are barricaded, shores, battered or benched where required.<br>

  • 3. Excavations are barricaded when not worked upon.<br>

COMMENTS

  • Tap to enter information

11. CONFINED. SPACE

  • 1. Confined space work is being carried out.<br>

  • 2. Confined spaces controls are in place for the work..<br>

COMMENTS

  • Tap to enter information

12. ENVIRONMENTAL

1. Air Quality

  • 1. Fumes from paint or solvents controlled.<br>

  • 2. Controls are in place to prevent gas from being released into the atmosphere.<br>

  • 3. Dust suppression controls are available and being used at the site.<br>

  • 4. Exhaust emissions appropriate controls are being used.<br>

2. Energy Use.

  • 1. Electricity use is minimized where possible.<br>

  • 2. Air-conditioning and heating is being used efficiently.<br>

3. Noise.

  • 1. Controls are in place where noise levels exceed 85dB(A).<br>

  • 2. Hours of work are in compliance with EPA requirements (6.30am to 6.30pm Monday to Saturday)<br>

  • 3. Plant and equipment use appropriate noise silencers.<br>

4. Oil & Fuel

  • 1. Oils & fuels are stored in designated storage areas.<br>

  • 2. Bunding is in place to capture any leaks.<br>

  • 3. Spill containment kit is available at site.<br>

  • 4. Used oils are disposed of by recycling.<br>

5. Land

  • 1. Erosion/ sediment controls are established and maintained.<br>

  • 2. Controls have been established for items of cultural heritage.<br>

  • 3. Underground services have been located and identified.<br>

  • 4. Controls are in place to prevent soil from being deposited on public roads (from vehicles leaving site)<br>

6. Flora & Fauna

  • 1. Controls have been established to minimize the project impact on fauna.<br>

  • 2. Controls are appropriate to prevent the spread of declared plants.<br>

7. Ozone Depleting Substances

  • 1. Ozone depleting gases are captured in recovery vessels.<br>

  • 2.Bio-degradable cleaning substances are used where possible.<br>

8. Revegetation.

  • 1. Landscaping & Revegetation requirements have been identified.<br>

9. Waste

  • 1. Waste materials are separated and recycled where possible.<br>

  • 2. Hazardous waste is disposed of in the approved manner,<br>.<br>

10. Water.

  • 1. Water use is minimised.<br>

  • 3. Controls are adequate to prevent solvents entering the sewerage system.<br>

  • 2. Controls are adequate to prevent silt entering storm water system.<br>

COMMENTS

  • Tap to enter information

20. COMMENTS

ADD OTHER COMMENTS:

  • Tap to enter information

Signed off by:

  • Tap to enter information

  • WHS Adviser

  • Site Manager/ Fore person

Distributed to:

  • Managing Director<br>

  • Construction Manager<br>

  • Project Manager/ Supervisor.<br><br>

  • Site Manager.<br>

  • Site WHSA.<br>

  • Management Services Officer.<br>

  • Other<br>

  • Tap to enter information

  • Tap to enter information

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.