Information
-
Document No.
-
Audit Title:
-
Site Safety & Environmental Inspection.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Site Manager/ Foreperson:
-
Project Manager:
Form JMK-PP-10c. Revision: 10
1. ADMINISTRATION
-
1. Signage at site in place and correct<br>
-
2. WHS Management Plan available & signed by all parties.
-
WHS Management Plan - Revision No:
-
WHS Management Plan - Date:
-
3. Company policies displayed.
-
4. General construction industry induction- records available<br>
-
5. Site specific safety inductions- conducted.<br>
-
6. WHS Adviser has been appointed to the site.<br>
-
7. WHS Representatives- have been elected on site.<br>
-
8. Pre-start meetings - held before work starts and is documented.<br>
-
9. Toolbox meetings conducted regularly<br>
-
10. Toolbox meeting minutes distributed to onsite personnel.<br>
-
11. Access to MANGO Action requests available.<br>
-
12. Interrupt site services or Safety conditions Request (form JMK-PP-10f) been completed where services or safety conditions to an organisation may be affected by construction work activity.<br>
-
13. Demolition work - Site services control guide (form JMK-PP-10e) has been completed prior to commencement.<br>
COMMENTS
-
Tap to enter information
2. EMERGENCY & FIRST AID
-
1. Emergency evacuation procedures are in place<br>
-
2. Names and contact details of emergency warden displayed.<br>
-
3. Emergency facilities and equipment are adequate and maintained.
-
3(i) Exit signs<br>
-
3(ii) Alarms<br>
-
3(iii) Equipment<br>
-
3(iv) Paths of travel.<br>
-
3(v) Fire extinguishers.<br>
-
4. First Aid kit is available & location prominently displayed.<br>
-
5. Name and contact details of first aider displayed<br>
-
6. Incident report forms are available.
COMMENTS
-
Tap to enter information
3. WORK. ENVIRONMENT
-
1. Warning signs - located at risk areas.<br><br>
-
2. Amenities- available, adequate and maintained.<br>
-
3. House keeping- controlled; paths of travel are clear.<br>
-
4. PPE- being worn.<br>
-
5. Site is adequately secured against unauthorized access.<br>
-
6. There is sufficient lighting to allow to be conducted safely.<br>
-
7. There is sufficient lighting in stairwells etc... to allow safe evacuation in an emergency.<br>
-
8. There is adequate ventilation to enable workers to carry out work without H&S risk.<br>
-
9. Working conditions are satisfactory (not working in extremes of heat or cold)
-
10. Controls in place to ensure workers are not exposed to H&S risks when working in extremes of heat or cold.<br>
-
11. Work is being carried out away from essential services.<br>
-
12. Safety controls are in place to ensure persons performing work near or to essential services are not exposed to H&S risks.<br>
COMMENTS
-
Tap to enter information
4. PLANT
-
1A<br>. Licences/ Competency evidence available
-
Cranes & hoist
-
Details:
-
Dogging<br>
-
Details:
-
Rigging<br>
-
Details:
-
Fork lift<br>
-
Details:
-
Scaffolding<br>
-
Details:
-
11mtr Boom EWP.<br>
-
Details:
-
Concrete Boom.
-
Details:
-
1B. Other plant and equipment
-
Skid steer.<br>
-
Details:
-
Excavator<br>
-
Details:
-
Dozer<br>
-
Details:
-
Backhoe<br>
-
Details:
-
Front-end loader.<br>
-
Details:
-
Scraper<br>
-
Details:
-
Road roller.<br>
-
Details:
-
2. Register has been developed for the site.<br>
-
3. Risk assessments have been conducted (form JMK-PP-08c)<br>
-
4. Plant & equipment (other than hand tools) checked prior to use (form JMK-PP-10g)<br>
-
5. Is regularly maintained.<br><br>
-
6. Maintenance records are available.<br>
-
7. Machinery guarding complies with relevant standards.<br>
COMMENTS
-
Tap to enter information
5. CHEMICALS
-
1. Hazardous chemicals are stored on site.<br>
-
2. Hazardous chemical storage is adequate.<br>
-
3. Hazardous chemicals are stored correctly.<br>
-
4. SDS's are available for hazardous chemicals.<br>
-
5. Hazardous chemical register (form JMK-PP-10b) is available & up to date.<br>
-
6. Hazardous chemicals Risk assessments have been done.<br>
COMMENTS
-
Tap to enter information
6. WORK METHOD. STATEMENTS
1. SWMS HAVE BEEN RECEIVED FOR & CHECKED using Form JMK-PP10a
-
Air-conditioning.
-
Checked
-
Asbestos removal
-
Checked
-
Brick/block laying
-
Checked
-
Concrete pumping
-
Checked
-
Concreting
-
Checked
-
Crane (mobile/ tower)
-
Checked
-
Demolition
-
Checked
-
Earthworks
-
Checked
-
Electrical
-
Checked
-
Elevators
-
Checked
-
Fire services
-
Checked
-
Formwork
-
Checked
-
Glass
-
Checked
-
Joinery
-
Checked
-
Painting
-
Checked
-
Piling
-
Checked
-
Plastering
-
Checked
-
Plumbing
-
Checked
-
Scaffolding
-
Checked
-
Steel fixing
-
Checked
-
Structural steel
-
Checked
-
Tiling
-
Checked
-
Water proofing
-
Checked
-
Other
-
Checked
-
Other
-
Checked
COMMENTS
-
Tap to enter information
7. HEIGHTS ACCESS & WORK
-
1. Ladders extend 1.0mtrs above access & secured against movement.<br>
-
2. Work at heights permits have been issued for persons using fall arrest/travel restraint harness and lanyard systems.<br>
-
3. Harness & lanyard- 6 monthly inspection records available.<br>
COMMENTS
-
Tap to enter information
8. ELECTRICAL
-
1. Permanent live wiring in the construction work area is clearly identified.<br>
-
2. Temporary construction wiring is clearly identified.<br>
-
3. R.C.D. protection being used.<br>
-
4. Electrical equipment on site (leads, tools, RCD, epods, temp. switchdoards, ) have been tested and tagged in last 3 months.<br>
-
5. Portable switch boxes (epods) are labelled showing number/feed.<br>
-
6. Temporary switch boards (numbered, signage on door, door shut etc....)<br>
-
7. Electrical leads protected against damage.<br>
COMMENTS
-
Tap to enter information
9. SCAFFOLDING
-
1. Complies with the code of practice.<br>
-
2. Hand-over certificate available on site.<br>
-
3. Scafftags are attached to the scaffolding<br>
COMMENTS
-
Tap to enter information
10. EXCAVATION
-
1. Excavation control guide (form JMK-PP-10d) has been completed and issued to excavator operator & crew prior to excavation work commencing.<br>
-
2. Trenches are barricaded, shores, battered or benched where required.<br>
-
3. Excavations are barricaded when not worked upon.<br>
COMMENTS
-
Tap to enter information
11. CONFINED. SPACE
-
1. Confined space work is being carried out.<br>
-
2. Confined spaces controls are in place for the work..<br>
COMMENTS
-
Tap to enter information
12. ENVIRONMENTAL
1. Air Quality
-
1. Fumes from paint or solvents controlled.<br>
-
2. Controls are in place to prevent gas from being released into the atmosphere.<br>
-
3. Dust suppression controls are available and being used at the site.<br>
-
4. Exhaust emissions appropriate controls are being used.<br>
2. Energy Use.
-
1. Electricity use is minimized where possible.<br>
-
2. Air-conditioning and heating is being used efficiently.<br>
3. Noise.
-
1. Controls are in place where noise levels exceed 85dB(A).<br>
-
2. Hours of work are in compliance with EPA requirements (6.30am to 6.30pm Monday to Saturday)<br>
-
3. Plant and equipment use appropriate noise silencers.<br>
4. Oil & Fuel
-
1. Oils & fuels are stored in designated storage areas.<br>
-
2. Bunding is in place to capture any leaks.<br>
-
3. Spill containment kit is available at site.<br>
-
4. Used oils are disposed of by recycling.<br>
5. Land
-
1. Erosion/ sediment controls are established and maintained.<br>
-
2. Controls have been established for items of cultural heritage.<br>
-
3. Underground services have been located and identified.<br>
-
4. Controls are in place to prevent soil from being deposited on public roads (from vehicles leaving site)<br>
6. Flora & Fauna
-
1. Controls have been established to minimize the project impact on fauna.<br>
-
2. Controls are appropriate to prevent the spread of declared plants.<br>
7. Ozone Depleting Substances
-
1. Ozone depleting gases are captured in recovery vessels.<br>
-
2.Bio-degradable cleaning substances are used where possible.<br>
8. Revegetation.
-
1. Landscaping & Revegetation requirements have been identified.<br>
9. Waste
-
1. Waste materials are separated and recycled where possible.<br>
-
2. Hazardous waste is disposed of in the approved manner,<br>.<br>
10. Water.
-
1. Water use is minimised.<br>
-
3. Controls are adequate to prevent solvents entering the sewerage system.<br>
-
2. Controls are adequate to prevent silt entering storm water system.<br>
COMMENTS
-
Tap to enter information
20. COMMENTS
ADD OTHER COMMENTS:
-
Tap to enter information
Signed off by:
-
Tap to enter information
-
WHS Adviser
-
Site Manager/ Fore person
Distributed to:
-
Managing Director<br>
-
Construction Manager<br>
-
Project Manager/ Supervisor.<br><br>
-
Site Manager.<br>
-
Site WHSA.<br>
-
Management Services Officer.<br>
-
Other<br>
-
Tap to enter information
-