Title Page

  • Date (yyyymmdd Format)

  • Job Number:

  • Job Name:

  • Site Supervision:

  • Site Safety Manager:

  • Weather Conditions:

  • Location

1. Site Administration

  • 1a. Have all employees, subcontractor employees, and visitors completed the site orientation process and been issued a job sticker?

  • Corrective Action Taken:

  • 1b. Are all required Job Posters (OSHA, IDOT, DOL, etc), Ethics Notifications, and Emergency Numbers conspicuously posted?

  • Corrective Action Taken:

  • 1c. Are the Site Safety Manual and SDS/Hazcom Book current and readily available?

  • Corrective Action Taken:

  • 1d. Are First-Aid Kits readily available, stocked, and contents not expired?

  • Corrective Action Taken:

  • 1e. Are First-Aid/CPR trained personnel available on-site?

  • Corrective Action Taken:

  • 1f. Are Pre-Task Plans and/or Take-5 Books being completed on a daily and as necessary basis?

  • Corrective Action Taken:

  • 1g. Are weekly Toolbox Talks/Safety Trainings being held and documented?

  • Corrective Action Taken:

  • 1h. Are stretch and flex exercises being performed prior to the start of work and as necessary daily?

  • Corrective Action Taken:

  • 1i. Is the site entrance/exit clearly identified and all informational signage(i.e. No Trespassing, PPE requirements, Office Location, etc.) in place?

  • Corrective Action Taken:

  • 1j. Is required informational and warning signage in place throughout the project? (i.e. EXIT, NO EXIT, Fire Extinguisher, Floor Numbers, etc)

  • Corrective Action Taken:

2. Personal Protective Equipment

  • 2a. Is all required company supplied PPE stocked on-site and readily available?

  • Corrective Action Taken:

  • 2b. Were all observed personnel wearing the required PPE at time of audit?

  • Corrective Action Taken:

3. Fall Protection

  • 3a. Have all identified fall from height hazards been controlled?

  • Corrective Action Taken:

  • 3b. Was all observed fall arrest equipment, such as, harnesses, SRLs, lanyards, and anchorages free from obvious damage and appear to be in working order?

  • Corrective Action Taken:

  • 3c. Were all observed guard rails (wood or cable) in place, built, and maintained according to standards?

  • Corrective Action Taken:

  • 3d. Were all observed holes 2" or greater in their smallest dimension securely covered and clearly marked "HOLE"?

  • Corrective Action Taken:

  • 3e. Are Look-out Platforms being utilized on this site?

  • 3e-1. Have all structural installation plans bee reviewed, approved, and followed for Look-out installation?

  • Corrective Action Taken:

  • 3e-2. Has the Look-out been maintained in accordance with JMCC policy?<br> 1. All guard rails, toe boards, and netting are in place<br> 2. SRL's are in place<br> 3. Warning, Capacity, and Allowable Access signs are posted secured and in good condition

  • Corrective Action Taken:

  • 3f. Were all observed impalement hazards both vertical and horizontal protected?<br> (rebar, conduit, pipe, nails, etc)

  • Corrective Action Taken:

4. Electrical

  • 4a. Have all known exposures to high voltage been controlled?

  • Corrective Action Taken:

  • 4b. Did all observed breaker boxes have secure doors and were clearly marked/labeled with voltage present?

  • Corrective Action Taken:

  • 4c. Were all observed extension cords and power tools free from physical damage such as faults in insulation, missing grounds, missing guards, faulty triggers, etc?

  • Corrective Action Taken:

  • 4d. Did all observed electrical boxes, switches, and receptacle have tight fitting cover or plates, have all "Knock Outs" or holes covered protected or sealed, and have weatherproofing where needed?

  • Corrective Action Taken:

  • 4e. Were all observed electrical receptacles protected by GFCI?

  • Corrective Action Taken:

  • 4f. Did all observed electrical rooms have doors, signage, and were secured to prevent unauthorized access?

  • Corrective Action Taken:

  • 4g. Have measures been taken to prevent exposure to and contact with overhead power lines if present? (i.e. warning signs, markers, insulators)

  • Corrective Action Taken:

5. HOT Work (Welding, cutting, burning, torch)

  • 5a. Was there any work requiring a "Hot Work Permit" being performed?

  • 5a-1. Were proper permits obtained before starting the work?

  • Corrective Action Taken:

  • 5a-2. Was the observed hot work being performed being done in accordance with the terms of the permit? (Permit posted, fire extinguishing meathod present, fire watch utilized, area clean and flammables protected if present)

  • Corrective Action Taken:

6. Fire Prevention

  • 6a. Were fire extinguishers on site clearly visible and being maintained?

  • Corrective Action Taken:

  • 6b. Were all observed flammable liquids in approved containers such as gas cans with spring loaded closures and flame arresters, and stored in an acceptable manner when not in use?

  • Corrective Action Taken:

  • 6c. Were all observed compressed gas cylinder being stored, handled, used, and transported correctly?<br>

  • Corrective Action Taken:

7. Ladders and Scaffold

  • 7a. Were any ladders observed to be in use or available for use on site?

  • 7a-1. Were ladders in use or available for use observed to be free of any obvious defects, damage, or excessive wear; have all warning, instruction and capacity labels visible and legible; and be positioned, used, secured, and stored correctly?

  • Corrective Action Taken:

  • 7a-2. Were any observed job built ladders built in accordance with ANSI standards?

  • Corrective Action Taken:

  • 7a-3. Are ladder access and landing areas free from debris and other hazards?

  • Corrective Action Taken:

  • 7b. Was any supported or suspended scaffold observed to be in use or available for use on site?

  • 7b-1. Was the scaffold observed to be free of any obvious defects or deficiencies?

  • Corrective Action Taken:

  • 7b-2. Was the scaffold built by, being inspected by, and being used by qualified persons with valid scaffold certifications?

  • Corrective Action Taken:

8. Housekeeping

  • 8a. Were all walkways, stairways, ladder accesses, and work areas observed to be maintained in a clean and passable fashion?

  • Corrective Action Taken:

  • 8b. Were stored materials observed to be neat, orderly, and secured from displacement ?

  • Corrective Action Taken:

  • 8c. Were there an adequate number of maintained Facilities/Porta-potties and personal hygiene/wash stations on site and accessible to meet requirements and standards?

  • Corrective Action Taken:

  • 8d. Have perimeter protection controls been put into place to prevent the dislodgment of materials, tools and debris?

  • Corrective Action Taken:

  • 8e. Are trash container readily available and maintained?

  • Corrective Action Taken:

9. Cranes (Tower and Mobile)

  • 9a. Were cranes observed to be in use on site?

9a-1. Tower Crane

  • 9a-1a. Have all crane planning and pre-assembly meetings taken place and been documented?

  • Corrective Action Taken:

  • 9a-1b. Was the crane assembled and inspected by competent and qualified personnel per governing regulations and guidelines?

  • Corrective Action Taken:

  • 9a-1c. Is the crane being inspected and maintenance being performed per manufacturers specification?(Daily, Periodic, Annual)

  • Corrective Action Taken:

  • 9a-1d. Are crane communications systems in use and functioning for all foreseen tasks?

  • Corrective Action Taken:

  • 9a-1e. Have security measure been taken to prevent unauthorized access and secure the crane when not in use?

  • Corrective Action Taken:

9a-2. Mobile Crane

  • 9a-2a. Have all crane planning and pre-assembly meetings taken place and been documented?

  • Corrective Action Taken:

  • 9a-2b. Was the crane assembled and inspected by competent and qualified personnel per governing regulations and guidelines?

  • Corrective Action Taken:

  • 9a-2c. Is the crane being inspected and maintenance being performed per manufacturers specification?(Daily, Periodic, Annual)

  • Corrective Action Taken:

  • 9a-2d. Are crane communications systems in use and functioning for all foreseen tasks?

  • Corrective Action Taken:

  • 9a-2e. Have security measure been taken to prevent unauthorized access and secure the crane when not in use?

  • Corrective Action Taken:

  • 9b. When observed did the crane appear to be in good operating condition and being operated in a safe manner with all safety devices in place and with due regard to personnel and surroundings?

  • Corrective Action Taken:

  • 9c. Are any critical lifts being performed?

  • 9c-1. Have all critical lift plans been submitted to and reviewed by all appropriate parties?

  • Corrective Action Taken:

  • 9c-2. Is the lift being performed in accordance with the submitted and reviewed plan?

  • Corrective Action Taken:

10. Mobile and Heavy Equipment (Man Lifts, Telehandlers, Motorized Heavy Equipment)

  • 10a. Was any mobile or heavy equipment observed in use on site today?

  • 10b. Is the equipment being inspected daily by a trained user/competent person and records of those inspections available?

  • Corrective Action Taken:

  • 10c. When observed did the equipment appear to be free from any obvious damage or defects, appear to operating correctly, and appear to be being operated with due regard to personnel and surroundings?

  • Corrective Action Taken:

11. Confined Space

  • 11a. Have all confined spaces on site been identified and their locations made known to all on site personnel?

  • Corrective Action Taken:

  • 11b. Is any work requiring confined space entry being performed at this time?

  • 11b-1. Have all entry and other required permits been acquired prior to entry?

  • Corrective Action Taken:

  • 11b-2. Is the entry being performed in accordance with the terms and requirements of the permit?

  • Corrective Action Taken:

12. Site Specific Conditions

  • Was any work having circumstances or considerations from the response list observed?

12a. Lead Containing Substances

  • 12a-1. Has formal testing been performed to determine the presence of and level of lead present; and is there a written lead compliance plan in place for the project?

  • Corrective Action Taken:

  • 12a-2. Is all work being performed in accordance with the site lead compliance plan?

  • Corrective Action Taken:

  • 12a-3. Have all personnel been trained on the hazards associated with, health effects of, and the prevention of exposure lead hazards?

  • Corrective Action Taken:

12b. Asbestos Containing Substance

  • 12b-1. Is work on asbestos containing materials being performed by properly trained and qualified personnel?

  • Corrective Action Taken:

  • 12b-2. Is signage in place warning of the asbestos hazard in the area?

  • Corrective Action Taken:

  • 12b-3. Has proper containment with required signage been set up for asbestos work areas?

  • Corrective Action Taken:

  • 12b-4. Have provisions been made for proper disposal of generated waste? (waste properly bagged and in special waste/waste specific containers)

  • Corrective Action Taken:

12c. Silica Containing Substances

  • 12c-1. Is there a silica exposure control plan in place, has that plan been reviewed by all involved parties, and is work being performed in accordance with the plan?

  • Corrective Action Taken:

  • 12c-2. Are barricades and signage in place warning of the presence of a silica hazard?

  • Corrective Action Taken:

  • 12c-3. Are dust control measure such as wetting, HEPA vaccuum, and respiratory protection in place and appear to be functioning?

  • Corrective Action Taken:

12d. Steel Erection

  • 12d-1. Has a written steel erection plan been provided and a pre-erection plan review meeting been held?

  • Corrective Action Taken:

  • 12d-2. Have required concrete strength results been provided to the steel erector prior to the start of erection?

  • Corrective Action Taken:

  • 12d-3. Have any anchor bolts been repaired or modified?

  • 12d-4. Have repairs or modifications been approved by the structural engineer of record?

  • Corrective Action Taken:

  • 12d-5. Has the area beneath the erection been outfitted with signage and barriers to prevent entry and overhead protection provided to prevent falling objects and fire?

  • Corrective Action Taken:

12j. Form Work and Decking

  • 12j-1. Is there a plan in place for form and decking work, has that plan been reviewed by all involved parties, and is work being performed in accordance with the plan?

  • Corrective Action Taken:

  • 12j-2. Were all deck panels observed to be in place and secure? (no open holes or unsecured patches)

  • Corrective Action Taken:

  • 12j-3. Were observed tables, framing, forms and panels clean and free of loose debris prior to hoisting?

  • Corrective Action Taken:

  • 12j-4. Were observed re-shore devices secured, tied back, and tight?

  • Corrective Action Taken:

  • 12j-5. Were self climbing forms observed to be clean and power cables managed and protected?

  • Corrective Action Taken:

  • 12j-6. Were core and shear wall perimeter protection and anchor points observed to be in place?

  • Corrective Action Taken:

12e. Concrete Placement

  • 12e-1. Is there a plan in place for concrete placement, has the plan been reviewed by all involved parties, and is work being performed in accordance with the plan?

  • Corrective Action Taken:

  • 12e-2. Are personnel placing concrete wearing additional required PPE to prevent exposure to concrete? (gloves, splash protective apparel, rubber boots)

  • Corrective Action Taken:

  • 12e-3. Are adequately supplied wash stations and eye wash available?

  • Corrective Action Taken:

12f. Excavation, Trenching, Ground Displacement

  • 12f-1. Has a ground disturbance permit been submitted, reviewed and the excavation being performed in accordance with the provisions of that permit?<br>

  • Corrective Action Taken:

  • 12f-2. Will personnel be entering the excavation?

  • 12f-3. Has the excavation been properly protected by benching, sloping, shielding or shoring?

  • Corrective Action Taken:

  • 12f-4. Is the excavation dry and/or precautionary measures are in place for dewatering?

  • Corrective Action Taken:

  • 12f-5. Are access and egress points present and in accordance with standards?

  • Corrective Action Taken:

  • 12f-3. Is there a plan in place to protect open excavations? (immediate backfill, fence, barricades, handrail, etc)

  • Corrective Action Taken:

12g. Storm Water Pollution Prevention Plan (SWPPP)

  • 12g-1. Is there a written SWPPP and is it readily available for review?

  • Corrective Action Taken:

  • 12g-2. Are require inspections being preformed in accordance with the SWPPP? (weekly, monthly, rain fall event)

  • Corrective Action Taken:

  • 12g-3. Are required BMP's and devices(straw logs, socks, silt fence, catch bags, etc) in place and not in need of maintenance?

  • Corrective Action Taken:

12h. Work Over or On Water

  • 12h-1. Is there a plan in place for work on and over water, has that plan been reviewed by all involved parties, and is work being performed in accordance with that plan?

  • Corrective Action Taken:

  • 12h-2. Are rescue buoys and/or rescue boats on site, in place, and in working order (supplied with rescue equipment for boats)?

  • Corrective Action Taken:

  • 12h-3. Are floatation devices being supplied, inspected, and used correctly?

  • Corrective Action Taken:

12i. Temporary Heat

  • 12i-1. Are gas and power lines and connections in good condition and laid out in a manner which protects both the lines from damage as well as maintains clear access and egress?

  • Corrective Action Taken:

  • 12i-2. Do heaters have sufficient air supply and are atmospheric conditions being monitored to insure so?

  • Corrective Action Taken:

  • 12i-3. Are heaters guarded and positioned far enough from materials, debris and work to prevent fires or damage?

  • Corrective Action Taken:

12m. Rigging

  • 12m-1. Are all personnel performing rigging operations trained in accordance with applicable standards and requirements and have proof of that training on hand?

  • Corrective Action Taken:

  • 12m-2. Did all observed slings and lifting appliances appear to be in good shape and have load limit tags in place and legible?

  • Corrective Action Taken:

  • 12m-3. Were all observed hooks free from obvious deformities and have safety latches as required?

  • Corrective Action Taken:

12k. Demolition

  • 12k-1. Is there a demolition plan in place, has the plan been reviewed by all required parties, and has a pre-demolition meeting been held with all involved parties?

  • Corrective Action Taken:

  • 12k-2. Are dust control measures in place (wetting, negative air filter, etc) and do the measure appear to be effective?

  • Corrective Action Taken:

12l. Post-Tensioning

  • 12l-1. Is there a post-tensioning plan in place and has the plan been reviewed with all involved parties?

  • Corrective Action Taken:

  • 12l-2. Have all required signs, barricades, and warning devices been put in place prior to the start of operations?

  • Corrective Action Taken:

12n. General Public Protection

  • 12n-1. Does work intersect the public side walk?

  • 12n-1a. Are required signage and barricades in place? (Sidewalk Closed, Warning Overhead Work, Uneven Pavement, etc)

  • Corrective Action Taken:

  • 12n-1b. Are sidewalk canopies in place and maintained (clear walk area, overhead protection complete, lights where required)?

  • Corrective Action Taken:

  • 12n-2. Does work effect the public roadway?

  • 12n-2a. Are required signage and barricades in place?

  • Corrective Action Taken:

  • 12n-2b. Are flaggers in use as required trained and equipped to applicable standards and requirements?

  • Corrective Action Taken:

13. General Duty Safety Observations

  • 13a. Were other observations or miscellaneous findings that pose a potential hazard discovered during the audit process?

  • Note Observed Condition or Action:

  • Corrective Action Taken:

14. Incidents

  • 14a. Were there any near miss, property damage or personal injury incidents to report today?

  • Viewpoint Reference Number:

  • Incident Description:

15. Preventative, Corrective, and Disciplinary Actions

  • 15a. Were there any preventative, corrective, or disciplinary actions not previously noted taken today?

  • Description of Action Taken:

Audit Conducted By

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.