Information
-
Job No.
-
Job Location
-
Client
-
Conducted on
-
Prepared by
- Cost Association
-
Area
-
Description
-
Photos
-
Directed by:
- CM
- RFI
- Extra Work Order
- Change Order
- Material
- Deduct
-
Signature
-
Material Needed
-
Responsible Party
-
**************************************************************************************************************************************