Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Information
Site Details
-
Site name
-
General Site Photo
-
Site location
-
Date and time of inspection
-
Site job code within Shadforths
-
Type of work being conducted
Codes
-
Job cost code
-
Date of work commencement?
Client/Contract Details
-
Client
-
Scope of works?
-
Contract Type
Site Inspection
Site Details
-
Has a prestart meeting occurred?
-
Has the site safety pack been completed?
-
Has the site environmental pack been completed?
Collection of Site Details
-
Please add all details regarding the site inspection
-
Site Inspection Record
Site Detail
-
Photo
-
Details
-
Other relevant information
-
Relevant Site diagrams: i.e VMP (if required)
-
Any safety issues on site?
-
Is a risk assessment required?
-
Photo of safety issue.
-
Additional information to mitigate/manage the risk.
-
RAP required?
-
Will there be issues in site that will need rectification (RAP)?
-
Photo
-
Additional information
Sign off
Site Inspection sign off
-
Please sign off the site inspection and email to the RCM, Project Manager and the Project Engineer.
-
Sign off