Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Site Office/Desktop Inspection

  • Is the Quality Plan located within the site office, and has it been signed by the Project Manager?

  • Is a copy of the contract located on site?

  • Is a copy of the relevant specifications located on site?

  • Are the drawings available on site, and are the latest revisions?<br>(Refer to the project drawing register)

  • Is a copy of the works program displayed clearly within the site office, and is it the latest revision?

  • Are the quality testing requirements available on site. <br>- Ask: What governs the quality testing requirements for this project? (Example: Ipswich City Council specification)<br><br>Note: These can be located within P:Drive

  • Have the quality tests been carried out as specified per the project specifications and, are these accessible on site?

  • Have project inspections been carried out in accordance with the specifications and documentation is available accessible on site?<br>(Example; Does the contract say we need fortnightly meetings with the client?)

  • Have meetings with the client been carried out as requested and minutes have been recorded?

  • Have NCRs/ CAs/ PAs/ Complaints or other quality related issues been emailed to the Q.A manager?

  • If the project is within 14 days of practical completion, has practical completion been requested to the Engineer/Client?

  • If the project is behind programme and is not going to meet the contract practical completion date, have EOTs been requested and approved to cover this period?

  • Are all of the subcontractors working on site working under a Shadforths Subcontractor Agreement?

Tier 1 Projects Only

  • Work has been broken up into lots, and a lot register is maintained and accessible on site

  • ITPs have been filled out correctly and all relevant signatures obtained including milestones, witness points, hold points and authority to proceeds has been given.

Site Inspection Audit

  • Have all trenches been compacted properly?<br>* Compacted in maximum layers of 500mm<br>* Appropriate compaction equipment used<br>* Appropriate material used (material moisture content ok, material binding together (not to dry?))

  • Road Pavement<br>* Compactions adequate, moisture content ok, material suitable<br>* pavement shape ok, crown pointed not rounded

  • Asphalt / Seal<br>* No water ponding<br>* Rid-ability

  • Concrete (Footpaths / Kerb / Pram ramps, etc)<br>* No water ponding <br>* Visually good, no cracks, adequate expansion and contraction joints

  • How many Subcontractor/Supplier Performance Assessment forms (QA-05-12) have been filled in on different Subcontractor/Suppliers?

Rectification Action Plan

  • What needs to be rectified before the next audit?

  • Name of Auditor and signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.