Title Page

  • JCC Completed By:

  • Conducted on Date and Shift

  • Location

Shift Start Procedure

  • Is the area location data available?

  • Is the machine checked prior to any operation?

  • Are cable bolting holes drilled regularly?

  • Are the suitable trainings given for cable bolt drilling in underground Mines?

  • Are tools available for drilling of cable bolt holes of height more than 3 M?

Geotechnical Description

  • Is any geological discontinuity observed such as shear or fault in strata?

  • Is the information of shear or fault informed to Incharge?

  • Is the nature of rock known ?

  • Is there is any water seepage observed?

  • Is the marking on rock done before strarting operation?

  • Is recommended SSR followed in the area of operation?

  • Are all the support system are in good condition?

  • All required PPE's are available prior to drilling & grouting operation?

CABLE BOLT DRILLING & GROUTING OPERATION

  • Are the persons well conversant with Cable bolt drilling and safety requirements?

  • Are proper grouting material available U/G?

  • Is the hole drilled is appropiate length as specified in SSR?

  • Any instrument available for checking hole deviation?

  • Any instrument available for checking hole length?

  • Are other unwanted machineries removed from working site during cable bolting operation?

  • Is any person working under unsupported roof?

  • Are the distance of cable bolting followed on each & every face as per SSR?

  • Any person stands near machine during cable bolting operation?

  • Is proper tool available for pushing ropes on height?

  • Is sufficient packing material available for packing cable bolting holes?

  • Are the drilled holes for Cable Bolts checked by competent person?

  • Are the adequate length rope available for cable bolting?

  • Is cable bolt assembly consist of breether tube(10mm) and grout tube(15mm) properly tied ?

  • Is the cable bolt assembly prepared away from pre drilled hole area?

  • Is the breather tube and cable bolt tied to the cable at proper length as specified in SOP?

  • Is cable bolty assembly properly inserted into hole without kinking of both tubes?

  • Is proper platform used for inserting Cable Bolt assembly into the holes?

  • Is the pump set for cable bolting in good condition?

  • Is vicosity of the grout checked before grouting ?

  • Is Waterto Cement ratio of 0.35 to 0.5 maintained?

  • Is Hand Glove test performed as mentioned in the SOP?

  • Are hoses been lubricated before pumping the grout to grout tube?

  • Is proper pressure maintained for grouting into the feeder tube ?

  • Is any lumping or swelling up of Grout tube observed during grouting?

  • Is pumping continued at required rate till grout comes out of breether tube or air stops bleeding off?

  • Is both the tube sealed properly after grouting and trimmed ?

  • Is mixer and hoses properly cleaned after work completion?

  • Is report of grouting properly recorded and informed to shift supervisor?

  • Is there any abnormal failure found during cable bolting?

Evaluation:

  • Adequacy of SOP

  • Competency of Employee / Operator to follow SOP

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.