Title Page
-
JCC Completed By:
-
Conducted on Date and Shift
-
Location
Shift Start Procedure
-
Is the area location data available?
-
Is the machine checked prior to any operation?
-
Are cable bolting holes drilled regularly?
-
Are the suitable trainings given for cable bolt drilling in underground Mines?
-
Are tools available for drilling of cable bolt holes of height more than 3 M?
Geotechnical Description
-
Is any geological discontinuity observed such as shear or fault in strata?
-
Is the information of shear or fault informed to Incharge?
-
Is the nature of rock known ?
-
Is there is any water seepage observed?
-
Is the marking on rock done before strarting operation?
-
Is recommended SSR followed in the area of operation?
-
Are all the support system are in good condition?
-
All required PPE's are available prior to drilling & grouting operation?
CABLE BOLT DRILLING & GROUTING OPERATION
-
Are the persons well conversant with Cable bolt drilling and safety requirements?
-
Are proper grouting material available U/G?
-
Is the hole drilled is appropiate length as specified in SSR?
-
Any instrument available for checking hole deviation?
-
Any instrument available for checking hole length?
-
Are other unwanted machineries removed from working site during cable bolting operation?
-
Is any person working under unsupported roof?
-
Are the distance of cable bolting followed on each & every face as per SSR?
-
Any person stands near machine during cable bolting operation?
-
Is proper tool available for pushing ropes on height?
-
Is sufficient packing material available for packing cable bolting holes?
-
Are the drilled holes for Cable Bolts checked by competent person?
-
Are the adequate length rope available for cable bolting?
-
Is cable bolt assembly consist of breether tube(10mm) and grout tube(15mm) properly tied ?
-
Is the cable bolt assembly prepared away from pre drilled hole area?
-
Is the breather tube and cable bolt tied to the cable at proper length as specified in SOP?
-
Is cable bolty assembly properly inserted into hole without kinking of both tubes?
-
Is proper platform used for inserting Cable Bolt assembly into the holes?
-
Is the pump set for cable bolting in good condition?
-
Is vicosity of the grout checked before grouting ?
-
Is Waterto Cement ratio of 0.35 to 0.5 maintained?
-
Is Hand Glove test performed as mentioned in the SOP?
-
Are hoses been lubricated before pumping the grout to grout tube?
-
Is proper pressure maintained for grouting into the feeder tube ?
-
Is any lumping or swelling up of Grout tube observed during grouting?
-
Is pumping continued at required rate till grout comes out of breether tube or air stops bleeding off?
-
Is both the tube sealed properly after grouting and trimmed ?
-
Is mixer and hoses properly cleaned after work completion?
-
Is report of grouting properly recorded and informed to shift supervisor?
-
Is there any abnormal failure found during cable bolting?
Evaluation:
-
Adequacy of SOP
-
Competency of Employee / Operator to follow SOP