Title Page
-
Conducted on
-
Prepared by
-
Location
Job-Site Info
-
Date of Pour:
-
Area/Region:
-
Plant(s) Supplying Job:
-
Tester's Position:
-
Project Name:
-
Contractor:
Concrete Specs:
-
Mix #
-
Specified Slump
-
Specified Air
-
Mix #
-
Specified Slump
-
Specified Air
-
Mix #
-
Specified Slump
-
Specified Air
Jobsite Specs:
-
Concrete Contractor:
-
Placement Method:
-
Use of concrete (Application):
-
Weather Conditions:
-
Time Pour scheduled to begin:
-
Time Pour Actually Began:
-
Time Pour Ended:
-
No. of c.y. Ordered:
-
No. of c.y. Placed:
-
Requested # of c.y. per hour:
-
Actual # of c.y. per hour supplied:
-
Internal delays:
-
External Delays:
-
Number of Loads Rejected:
-
Reason:
-
Testing Lab Present:
-
Lab Technician's Name:
-
Lab Technician ACI certified?
-
Testing Comments:
Truck Tracking:
Truck 1
-
Truck #
-
Arrival Time:
-
Departure Time:
Truck 2
-
Truck #
-
Arrival Time:
-
Departure Time:
Truck 3
-
Truck #
-
Arrival Time
-
Departure Time
Truck 4
-
Truck #
-
Arrival Time
-
Departure Time
Truck 5
-
Truck #
-
Arrival Time
-
Departure Time
Truck 6
-
Truck #
-
Arrival Time
-
Departure Time
Truck 7
-
Truck #
-
Arrival Time
-
Departure Time
Truck 8
-
Truck #
-
Arrival Time
-
Departure Time
Truck 9
-
Truck #
-
Arrival Time
-
Departure Time
Truck 10
-
Truck #
-
Arrival Time
-
Departure Time
Truck 11
-
Truck #
-
Arrival Time
-
Departure Time
Truck 12
-
Truck #
-
Arrival Time
-
Departure Time
Truck 13
-
Truck #
-
Arrival Time
-
Departure Time
Truck 14
-
Truck #
-
Arrival Time
-
Departure Time
Truck 15
-
Truck #
-
Arrival Time
-
Departure Time
Truck 16
-
Truck #
-
Arrival Time
-
Departure Time
Truck 17
-
Truck #
-
Arrival Time
-
Departure Time
Truck 18
-
Truck #
-
Arrival Time
-
Departure Time
Truck 19
-
Truck #
-
Arrival Time
-
Departure Time
Truck 20
-
Truck #
-
Arrival Time
-
Departure Time
-
Tester's Signature: