Information
-
Customer
-
Project/Job
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PERSONAL PROTECTIVE EQUIPMENT
-
A. Hard Hats
-
B. Safety Glasses
-
C. Safety Vests
-
D. Other
FALL PROTECTION
-
A. Fall risk of 6 ft or more? (Including voids, pits and trenches)
-
B. Fall protection plan in place?
-
C. Handrail and edge protection in place?
-
D. Impalement hazards?
-
E.. Harness and lanyard inspected and properly anchored?
-
F.. Ladders inspected and properly secured?
EXCAVATIONS
-
A. OUPS notified?
-
Competent person inspected?
-
B. Ladders in trenches over 4 feet deep?
-
C. Excavations deeper than 5 feet need protection. Proper layback, shoring or trench box in place?
-
Spoils greater than 2 feet from the edge of trench?
-
Soil properly classified?
HEALTH/FIRST AID
-
A. CPR/First AidTraining
-
B. First Aid Kit (No Expired Items)
-
C. Eye Wash Facilities
ELECTRICAL
-
A. G.F.C.I.'s
-
B. Extension Cords
-
-
Contact with overhead power lines?
SILICA
-
Potential Exposure to Silica
-
A. Equipment, respirators, etc cleaned and inspected?
SCAFFOLD
-
A. Trained Personnel (Competent Person)
-
B. Hand and Mid-rails, Toeboards
-
H. Inspection/Tagged Correctly
LIFTING AND RIGGING
-
A. Crane Inspection and set up
-
B. Loads lifted over persons, close to obstacles or overhead power lines?
-
C. Lifting equipment including ropes, slings, chains, hooks inspected?
-
D. Lifting equipment labels properly displayed?
TRAFFIC MANAGEMENT
-
A. Adequate pedestrian and vehicular traffic plan in place?
GENERAL SITE
-
A.adequate housekeeping?
-
B.adequate amenities (toilets, wash areas, lunch rooms, etc)
-
C.safety plan and hazard communication plan in place?
-
D. Subcontractors working safely?
-
Weather?
-
Conditions
COMMENTS/ RECOMMENDATIONS
-
Brief description of work being performed
-
Enter any corrective actions that will be undertaken
SIGN OFF
-
Safety Representative
-
Construction Supervisor