Information
-
Audit Title
-
Jobsite:
-
Conducted on
-
Prepared by
-
Location
-
Foreman:
Strain Injury Prevention
-
Can the foreman explain the "Early Intervention Program" and his responsibility for that program?
-
Can Carpenters (Interview 2 ) show or explain how to properly lifty sheetrock and bundle studs?
-
Can employees (interview 2) explain the "tri-pod" stance to be used when forward bending?
Housekeeping
-
Are power cords in walkways either hung-up or kept straight and against the wall AND not "Rat Nested"
-
Add media
-
Are tools that are not in immediate use, which are laying on the floor, placed next to a wall (within 1-foot of a wall or column and NEVER in the middle of walkways or stairs)?
-
Add media
-
Are all scraps immediately placed in containers or designated pile away from walkway?
-
Add media
-
Can you walk around the entire jobsite without stepping on or over tools, debris, and materials? (If not, stop everyone, and clean up & organize.)
-
Add media
Fall Prevention
-
Are guardrails, chains on lifts, or other approved fall protection in place, around all floor or wall openings six feet or greater above adjacent landing?
-
Are set screws tight on Fortress Scaffold trusses or pins in place correctly on Snappy scaffold?
-
Are decks placed right-side up, and firmly lodged between trusses on Fortress Scaffold or decks locked and secure on Snappy Scaffold?
-
Are stilts and components used on the jobsite in good condition?
PPE
-
Are all employees wearing hard-hats and safety glasses (Unless Sanding)?
-
Are employees handling studs wearing cut resistant gloves
-
Are employee cloths in good condition and appropriate for the customer’s environment?
Safety Management
-
Is the Daily Task Analysis or Monthly Inspection properly conducted, and is the form completed and onsite for review?
-
Have all employees onsite signed the Safety Sheet this day?
-
Is the “Pre-job Plan” folder onsite?
-
Equip. Checklist ie.(Aerial, Scissor, RT Forklift)
Other Observations
-
Comments
-
Add signature