Title Page
-
Audit Title
-
Client / Site
-
Prepared by
-
Personnel
Crane Lift Inspection
-
All Paperwork Submitted
-
1. Name of the operator<br><br>2. Operators crane card<br><br>3. Annual Crane Cert<br><br>4. What are we are lifting<br><br>5. Weight of item<br><br>6. Total boom length<br><br>7. Boom length time of lift<br><br>8. Swing Radius<br><br>9. Rigging Being used<br><br>10. Party executing rigging
-
Pre Lift Meeting - This meeting shall be held prior to the lift at each new work location and shall be repeated for any employees newly assigned to the operation
-
Inspection of all blocks, straps, guy lines.Examination for damaged, cracked, or worn parts, loose nuts and bolts, and of lubrication and condition of straps and guy lines
-
Confirm there is no heat damage including weld splatter Arc stripes or evidence of tearing or splitting
-
Confirm there is no excessive nicks, cuts, splices or corrosion.
-
Confirm all shakels are USA made precluding and rigging from China.
-
Review for legible manufacturers tags of rigging straps with rated load
-
Tag Lines Being Used
-
% of lift compared to max capacity based on load chart MUST be 70% or less
Training/Coaching Provided
-
Areas of training provided. Be specific.How did we help? What did we do?
-
Signatures
Untitled page