Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Principal Contractor

  • Kelburne is the principal Contractor as per the CDM REGs 2015

Previous inspection signed off

  • Has the previous inspection points raised been signed off<br>

  • Actions outstanding are now

General site conditions

  • Is the site secure

  • Are work areas secure and have barriers to secure the work area from unauthorised access

  • Are the works areas clear of slip trip falls, debris, protruding nails.<br>

  • Is re bar safe from people falling. Is there plastic caps on.

  • Is house keeping good, clean and tidy.

Plant and equipment

  • Plant and equipment on site has beacons and mirrors or reversing cameras

  • Excavators have quick hitch pins in place. Signs indicating type of quick hitch.

  • All driven plant was used correctly. Keys removed if not in use. Seat belts were worn. Parked or driven in a safe manner, in accordance with the traffic management plan.

  • Plant used for lifting has been connected correctly. SWL is clearly marked and is lifting within capacity.

  • Equipment being used is in sound condition and fit for purpose.

  • Water bottle on site for use with Stihl saw

  • Unsafe actions.

Excavations

  • Excavations were shallow and did not pose a danger

  • Excavations were more than 1 meter and had barriers and were shored with edge protection.

  • Excavation more than 2 meters deep, had Shoreing in place edge protection and checked by a competent person at the start of each shift.

  • Services are supported across open excavations

  • Excavations are not confined spaces requiring gas tests,training and rescue equipment

  • Excavation more than 3 meters deep. Had temporary works co-ordinator signed off. Edge protection in place. Signed off if open more than seven days.

  • Unsafe actions.

Emergency arrangements

  • There were First aiders on site relative to the risk. First notice displayed and up to date.

  • There was fire fighting equipment on site. Fire assembly point was displayed. Smoke detectors in canteen, fire blanket in the canteen.

  • Fire risk assessment was in place.

Management procedures.

  • Site inductions and tool box talks have been completed for operatives on site.

  • Site registers, are up to date and completed according to the CDM REGS 2015

  • Permits required for current works on site.

  • Copies of services are on site and marked up.

  • Certificates for plant were on site, including chains etc.

  • Training certificates were on site for operatives using plant and equipment.

  • Safety signs and poster including F10 where applicable

  • Management procedures are in place to reduce the risk of HAVS.<br>PRE Selection of equipment below 10 ms, details recorded on ACS HAV record sheet .

Environmental

  • Environmental procedures in place.

  • Spill kits and drip trays on site .

Personal Protective Equipment

  • All operatives on site were wearing Head Protection, in good order, the correct way round.

  • Operatives were observed wearing hearing protection correctly. They understood the requirement to wear them and dangers if not worn whilst working in noisy environment.

  • Operatives were observed wearing RPE. Correct type for the works, FFP3 for silica. Face fit tested and clean shaven.

  • Safety googles or glasses were being worn for the correct operation.

  • Gloves fit for the task were worn. <br>Where mandatory requirement of the principal contractor.

Overhead and Underground Services

  • Overhead cables have been identified, a GS6 agreement has been reached with the service provider.goal posts tape and bunting has been erected as per the GS6

  • All services on site have been identified, drawings on site, area CAT scanned and ground marked.

Traffic Management

  • Traffic management plan is in place, displayed and being followed

Laying kerbs, mono block or slabs

  • Material moved close to the works by mechanical means.

  • Dust suppression used if cutting.

  • Grabber, vacuum lifter, or mechanical means to lay material .

Confined spaces

  • Type 2 confined space trench or manhole more than 2 meters deep or with special risks,<br>trained operatives, permit in place, gas monitor used, rescue plan in place.

  • Type 3 confined space, full rescue plan, gas monitor, trained operatives with top man in attendance.

  • Type of confined space is type 3 trench less than 2 meters no special requirements

Signatures.

  • Signed by site supervisor

  • Seen by Managing Director

  • Received by Contracts Manager

  • Time and date of inspection

  • Remedial action to be completed by

  • Add drawing

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.