Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Previous Reports
-
Has the previous report been reviewed?
-
Have all actions from previous report been closed out?
General Site conditions
-
Are walkways clear from obstructions?
-
Are vehicles segregated from pedestrians were ever possible?
-
Adequate signage?
-
Adequate welfare facilities, clean, tidy and maintained?
-
Hand tools in good order?
-
Are materials stored safely?
Qualification of Scaffolders?
-
Is the scaffold being erected under the directions of a competent person?
-
Do all scaffolders hold a current CISRS Part 1 Card?
-
Do all scaffolders hold a current CISRS System scaffolding certificate for system been erected?
-
Do all scaffolders hold PASMA Cards for Mobile aluminium /GRP towers?
Erection Process
-
Site specific Method Statement/Risk Assessment briefed and understood?
-
Rescue plan briefed and understood?
-
Have scaffolds been designed or built as per TG20?
-
Is there evidence that the scaffolds are erected as per SG4 2015
-
Are Scafftags completed and displayed?
-
Are all compulsory signs displayed (Scaffold incomplete etc)?
-
Scaffolders wearing safety harnesses?
-
Scaffolders clipping on as required?
-
Only scaffolders modifying scaffolds?
-
Is the scaffold on base plates?
-
Are soul plates level, sound and rigid and minimum dimension 450mm x 225mm?
-
Is the scaffold plumb and squared?
-
Correct fittings used?
-
All bracing installed?
Means of access?
-
Staircase?
-
External Tower with single internal ladder?
-
External Tower with multiple internal ladders?
-
Internal ladder with trap door on working platform.?
-
External ladder and gate?
Anchorage systems / scaffold ties
-
No ties required?
-
Ring (Hilti)?
-
Screw plug?
-
Chemical anchors?
-
Self tapping (Excalibur)?
-
Through ties?
-
Reveal ties (Max 50%)?
-
Rakers and butt ties?
-
Buttress, if used must be designed?
-
Ties tested (Min 5% as per TG4 11?
Working platforms and edge protection
-
Are all working platforms fully boarded?
-
Are scaffold boards secured (TG 12)?
-
Height to handrail, minimum 950mm?
-
Minimum height of toe board 150mm?
-
Intermediate handrail fitted ensuring no gap greater than 470mm?
-
Are all materials stored safely and scaffolds not overloaded?
-
Are brick guards in place and secure?
Summary
-
Comments
-
MJD SCAFFOLDING SUPERVISOR
-
AUDITOR