Title Page
-
Site Name
-
Conducted on
-
Prepared by
-
Location
-
Site security and sign in procedures in place<br>
-
Pedestrian walkways are clearly marked and in place.
-
Site Welfare Facilities in good order
-
RAMS in place and signed be GBR operatives?
-
GBR daily briefing signed?<br>
-
Scaffold inspection report completed?
-
Tool Box Talks completed?
-
Harness & Lanyard Inspections completed?
-
Is scaffold in good order?
-
Are Scafftags visible on site
-
Correct PPE being worn on site by GBR Operatives
-
Work areas left clean and tidy?
-
Are the loading bays being used correctly
-
Are the ground conditions suitable and acceptable
-
Is house keeping on site to a good standard?
-
Have materials been loaded out correctly on the scaffold lifts?
-
Any other items?
-
Conditions applicable to the submission of this audit report. 1. Every reasonable care is taken in the compilation of this report, but liability cannot be accepted for errors or omissions which occur in uninspected areas or with unseen equipment or materials, during any operations which were not being conducted at the time of the inspection, or due to misinformation. 2. Clearly obvious hazards are noted in the report, but risk from unforeseeable, unnotified or less evident hazards may still occur. There is no implication in the report that such hazards do not exist. 3. Reports on all items of access are based only on visual inspection. There is no implication whatsoever that the design thereof must be adequate as this is a matter for suppliers and those issuing certificates. 4. A full and detailed inspection of any fixed scaffold or other access to comply with the requirements of Regulation 12 of the Working at Height Regulations (2005) has not been made during this inspection. This report details any obvious defects noted during the inspection process but others might remain. If the client requires such an inspection, then this must be carried out separately. 5. This report is passed to the client for action as they see fit. No further actions will be taken by the compiler of the report without authority of the management .