Title Page
-
Audit Title
-
Conducted on
-
Site address (co-ordinates for highest reading)
-
Team leader
-
Job number
-
Visual inspection of the location of street furniture, BT/valve boxes and previous patches
-
Establish the approximate depth of main
-
Conduct bar holding/rock drilling in accordance with NGUK/PR/EM/72 making reference to "good pass" aide memoir
-
Confirm that all utility plans have been referenced
- bt
- virgin
- water/sewer
- electric
- gas
-
Confirm that a cat and genny survey has been carried out
-
Confirm that tornado has been used on all rock drills and additional bar holes are not required
-
Is a BT mark up required