EPG 4.2 Flora fauna
General
-
No refueling within 50 m of a watercourse
-
No spillage of fuels, oils or other haz. Substances into water evident?
-
Areas identified as environmentally significant or designated operation prescription zones are clearly marked?
-
Provide detail why area is not delineated
-
Has machinery entered boggy areas suitable for green and gold frogs or giant freshwater crayfish?
-
Add details of infringement
-
Add media
-
Add details and description of photograph
-
Disturbance within 5 m of any identified MNES avoided
-
Provide explanation of breach
-
Add media
Protection of Flora
-
Clearing felled into construction corridor?
-
Epacris taped off?
-
No machinery, cars or materials under drip lines of trees?
-
Topsoil not stored against trees or under drip lines?
Protection of fauna
-
Toolbox meeting held to outline potential habitat requirements for GGF, quoll, Tasmanian devil, wedge tailed eagle, masked owl, burrowing crayfish and giant freshwater crayfish.
-
Select date
Employees attending
-
Add signature
-
Animal proof fences installed when operations not in progress?
-
Add media
-
Cleared weeds, when removed are piled to provide temporary shelter for bandicoots?
-
Add media
-
Wedge tailed eagle nest survey required?
-
Date survey completed
-
Explanation
-
Masked owl habitat present?
-
Add location
-
Add media
-
Protective no-go marked?
-
Creek crossings not impeding flow by placement of barriers, changing water velocity or removal of habitat
-
Select date
-
Add location
-
Add media
-
Crayfish removal completed
-
Date survey completed
-
Completed by:
Sediment management
-
Sealed bins used for waste?
-
Silt traps effective?
-
Add location
-
Add media
-
Revegetation healthy and site regenerating?
-
Date of audit
-
Add location
Auditor summary
EPG 4.12 Creek crossings
Target: minimal environmental impact to existing waterways, drainages and water bodies.
-
Pipeline construction parallel to drains and waterways.
-
Add location
-
Select date
-
Add media
-
Pipeline crosses waterway at perpendicular?
-
Add location
-
Select date
-
Add media
-
Has soil been stockpiled or machinery entered within 2 m from the edge of drains or waterways?
-
Provide information.
-
Add media
-
Have trees or trees or shrubs been cleared from adjacent waterways during construction?
-
Provide details of clearing, authority provided and remediation works to be undertaken.
-
Collect photographs of clearing
-
Is an incident report required?
-
Incident report to be completed by:
-
Date to be completed by:
-
Construction is undertaken during dry conditions?
-
Provide details of impacts if any and attach photo.
-
Add media
-
Is sediment netting being used?
-
Add media
Crossing monitoring
-
Machinery are only crossing at designated points?
-
Add location
-
Add media
-
Waterway and drainage crossings and pipeline construction in close proximity to waterways, drainages or dams are to be inspected weekly and immediately following any significant storm events.
-
Select date
-
Add location
-
Add media
-
Observation notes
-
Add drawing
EPG 4.13 erosion
Erosion and sediment control methods audit weekly observations
Objective: minimize potential for erosion within the pipeline corridors and avoidance of sedimentation of adjoining properties, dams and drains.
-
Site erosion and sediment audit
Site
-
Sediment control method
- sediment fence
- roll over mound
- riparian vegetation
- rip rap
- cur vegetation
- cut off drain
- straw bales
- sediment pond
-
Location
-
Select date
-
Site traffic is not causing erosion
-
Soil is not been lost due to wind and water erosion
-
River banks are stable
-
Add media
-
Comments
Emergency response required?
-
Dam or waterway at immediate threat?
-
Is an emergency response required?
-
Reinstate erosion and sediment contrls
-
Additional control measures required?
-
Detail responses to be undertaken
-
Detail additional controls to be applied
-
Action to be implemented by
-
Actions assigned to
-
Supervisor notified?
-
Provide details of notification and requests
-
Select date
General observations and notes
-
General observations of activities being undertaken.
-
Add media
-
Add drawing
EPG 4.14 Aboriginal
Objective: to protect Aboriginal cultural heritage values both are tracts and a landscape values that may be encountered during construction of the pipeline.
-
Contractor has undiscovered artifact plan available on site and staff are familiar with it.
-
Known sites are protected with appropriate buffers and protective fencing?
-
Buffer zones have not been impacted?
-
Provide explanation of impact on buffer zones.
-
Enter location of impact
-
Photograph impact
-
Sketch of impact
Unanticipated discovery
-
New site identified
-
Date of find
-
Location of find
-
Add media
-
Enter description and actions proposed or taken
-
Drawing of I site features and approximate location.
-
Acknowledgement of site location.
A
-
Signed
EPG 4.17 Weed control
Objective: minimize the transfer of weeds infectious plant diseases and fungal infestation within and between sites.
-
Target : no spread of noxious weeds, infectious plant disease and fungal infestation within the site or from one site to another or to adjoining land.
No importation of infectious plant diseases from another geographic region.
Known weeds
-
Weeds noted to be on site
- crack willow
- ragwort
- blackberry
- canary broom
- Spanish Heath
- gorse
- slender thistle
- Elisha's tears
- tuts an
- swamp grass
Control methods
-
Vehicle wash down site
-
Add location
-
Add media
-
Notes
-
Restricted site?
-
Have site restrictions been adhered to?
-
Add media
-
Provide explanation of breach
-
Vehicles being washed down prior to exit from sites identified as containing introduced flora species? And in accordance with Tasmanian field hygiene manual to prevent the spread of freshwater pests and pathogens?
Monitoring
-
Monitoring sites
Site:
-
Select date
-
Location
-
Compliance with infectious plant disease controls?
-
Evidence of weeds and foreign plant material in stockpiles
-
Note weeds present in the stockpile
-
Add media
-
Provide explanation as to why hygiene protocols are not being applied.
-
Spot inspection of machinery
Machine
-
Machine
-
Add location
-
Select date
-
Add media