Title Page
-
EYENG/MEPKPI
-
KPI Scorecard - MEP Audit
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
MEP KPIs
-
1. Preventive Maintenance - A - Carry out Planned Preventive Maintenance as per approved schedule for all Class A equipment.
-
2. Preventive Maintenance - B - Carry out Planned Preventive Maintenance as per approved schedule for all Class B equipment.
-
3. Preventive Maintenance - C - Carry out Planned Preventive Maintenance as per approved schedule for Class C equipment.
-
4. Corrective Maintenance - A - Carry out Corrective Maintenance with in required response time for all Class A equipment.
-
5. Corrective Maintenance - B - Carry out Corrective Maintenance with in required response time for all Class B equipment.
-
6. Corrective Maintenance - C - Carry out Corrective Maintenance with in required response time for all Class C equipment.
-
7. Certification - Service provider to ensure validity of all required certification for all cranes, elevators and platforms for SWL/PL
-
8. WWT Plant Operation - Operation of WWT plant including supply of all chemicals and other consumables to ensure effluent is treated to prescribed standards and submit monthly reports.
-
9. Hazardous and Medical Waste Disposal. Collection, identification, staging and disposal with proper treatment of hazardous and medical waste and submission of reports from authorities.
-
10. Civil / Building Fabric Maintenance - Repairs of windows, doors, all figures and fittings (eg. door latches and locks, hinges, handles etc.) walls and tiles to include grouting, sealing and fixing of isolated tiles.
-
11. Painting - General painting if walls, doors and ceilings when required, also following any maintenance work.
Signatures
-
Site Representative
-
Auditor