Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 Maintenance
-
1.1 Maintenance Requests - Prompt and efficient response to maintenance requests.
-
1.2 Water supply and drainage - comprehensive maintenance of water supply and drainage is in top operating condition
-
1.3 Air conditioning - comprehensive maintenance of air conditioning supply and associate equipment is in top operating condition
-
1.4 Electrical - electrical supply, equipment and distribution services is in top operating condition
-
1.5 PPM - Planned preventive maintenance in place, documented and followed
-
1.6 Inspections - regular inspections carried out, documented and reported
2.0 MEP and Life Safety Systems
-
2.1 Repair and replacement - repair and replacement of mechanical and electrical equipment, water heaters and extraction fans
-
2.2 Water pumps - repair to water pumps wherever possible
-
2.3 Water pipes and tanks - repair leaks to water pipes and tanks
-
2.4 Sanitary Fittings - repair and replacement of sanitary-ware fittings
-
2.5 Drainage - attention to drainage problems
3.0 Preventive Maintenance
-
3.1 Electrical and lighting circuits - safety trip checks of lighting and electrical circuits
-
3.2 Distribution boards - Check/inspection of distribution boards
-
3.3 Water Heaters - Check/inspection of water heaters
-
3.4 Pumps and controls - Check/inspection of all pumps and controls
4.0 Air Conditioning
-
4.1 Quarterly service - quarterly service of indoor and outdoor units as per PPM
-
4.2 Filters - cleaning filters and replacement as per PPM
-
4.3 Electrical components - cleaning and checking electrical components as per PPM
-
4.4 Coils - pressure washing of coils as per PPM
-
4.5 Fluids - topping up of refrigerant and oil as per PPM
-
4.6 Belts - belt replacements were required
-
4.7 Drain lines - lubrication and cleaning of drain lines as per PPM
-
4.8 Drip trays - drain flow drip trays as per PPM
-
4.9 Touchups - minor painting and insulation touchups
5.0 Carpentry and Aluminum
-
5.1 Doors - repair to fly screens, windows and doors (not replacement)
-
5.2 Doors - repairs to door latches, locks and hinges
-
5.3 Cupboards and drawers - repairs to cupboards and drawers
6.0 Masonry
-
6.1 Tiling - minor grouting, sealing and fixing of isolated tiles
7.0 Painting
-
7.1 Touchups - touch up painting only, following maintenance work
Sign Off
-
On site representative
-
Auditor's signature