Information

  • Inspection No:

  • Site/Location:

  • Inspection commenced on:

  • Report Prepared by:

  • Personnel involved with inspection:

Percentage of Inspection Results

Section 1 - Documentation

1.1 - Safety Training and Inductions

  • Training records present

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

1.2 Safe Work Instructions/Risk Assessments

  • SWI & RA for chemicals/equipment/processes<br>

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Dated within last 3 years

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

1.3 Chemical Register/MSDS

  • MSDS sighted/available found in Safety Database

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

1.4 Inspections

  • Records present

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Evidence of actions

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

1.5 Emergency procedures

  • Emergency booklet by phone

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Floor plan visible

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Area emergency procedure posted

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Wardens identified

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

Section 2 - Emergency Equipment

2.1 Safety showers/Eye wash

  • Accessible (clear path)

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Operational

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Tested

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

2.2 Fire extinguishers

  • Accessible

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Appropriate

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Tagged

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

2.3 First aid

  • Kits within 20 metres

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Modules/size appropriate to area

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Stocked and within expiration date

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • First Aiders identified

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

2.4 Ergonomic Conditions

  • Noise

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Lighting

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Ventilation

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Heat/Cold mitigation

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

Section 3 - Chemical, Waste - Storage and Handling

3.1 Storage

  • Chemical stored according to Monash's guidelines

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Incompatibles segregated

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Chemicals in use labeled and stored in closed vessels

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Bulk storage - handling issues

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

3.2 Spill kits

  • Available

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Appropriate to the substances present in work area

  • Action(s) required

  • Notes/Comments

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Spill management procedures visible

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

3.3 Gas cylinders & Gas lines

  • Gas cylinders secured

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Connections secure and tubing suitable for pressure

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Appropriate gas detector is available

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Oxidising & Flammable gases segregated

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

3.4 Cryogenic liquids

  • Stored in appropriate vessel

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • PPE available

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

3.5 Waste chemicals storage - labelled waste vessels

  • Vented caps & Plastic bottles used unless chemically incompatible

  • Notes/Comments

  • Person responsible

  • Action(s) required

  • To be completed by

  • Checked by

  • Date completed

  • Designated and labelled storage vessels

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

Section 4 - Other Hazards

4.1 Manual Handling

  • Heavy items stored low

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Lifting devices available

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

4.2 Biological Hazard

  • Are there any Biological hazards

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

4.3 Ionising radiation

  • Is there any Ionising radiation

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

4.4 UV Radiation

  • Is there any UV Radiation

  • Action(s) required

  • Notes/Comments

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

4.5 Lasers

  • Are there any Lasers

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

4.6 Personal protective equipment

  • Available

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Appropriate

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Condition

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

4.7 Signage

  • Dangerous goods

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Personal protective equipment

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Hazard alert

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Permits to operate attached to rigs

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

Section 5 - Electrical and Machinery

5.1 Appliances

  • Tested & tagged

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Condition

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

5.2 Fume Cupboards

  • Sash height level with yellow diamond

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Tested annually

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Storage minimised and no items close to leading edge

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

5.3 Refrigeration/freezing devices used

  • Used appropriately

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Signed where required

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Seals on doors are in good condition

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

5.4 Machines/rigs fitted with

  • Guarding

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Emergency stop features

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Isolation capabilities

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

Section 6 - Housekeeping & Hygiene

6.1 Non power equipment (including glassware)

  • Appropriately stored, used and in good condition

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

6.2 General area

  • Is the general area clear from obstruction

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

6.3 Storage

  • Are cupboards/racking/other storage devices utilised

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Bench storage minimised

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

6.4 Housekeeping (i.e doorways, aisles, landings)

  • Floor space, exits, isles clear from obstruction

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Waste receptacles clearly identified

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Confirm there are no visible spills and stains

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Confirm appropriate cleaning supplies are available

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

6.5 No food in work area

  • Confirm there is no food in the work area

  • Notes/Comments

  • Action(s) required

  • Person responsible

  • To be completed by

  • Checked by

  • Date completed

  • Miscellaneous notes

Signed off

  • Inspection Team Member

  • Inspection Team Member

  • Inspection Team Member

  • Inspection Team Member

  • Lead Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.