Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General
-
Weather Conditions?
-
Which water authority will be responsible for works once the maintenance period is over?
-
Which authority accredited contractor has been nominated to complete sewer reticulation works?
- Citadel Services Group
- Gibilisco & Sons Pty Ltd
- Pestcatore Constructions Pty Ltd
- Califam Constructions Pty Ltd
- Azzona Drainage Contractors
-
Does the sewer contractor have the correct revision of "issued for construction" drawings on site?
-
Describe the section of works audited with reference to sewer manhole numbers &/or subdivision street names?
-
Is the section of works audited trafficable or non-trafficable?
- trafficable
- non-trafficable
- both
OH&S
-
Site personnel wear appropriate personal protective equipment as required? I.e high visibility clothing, hard hats & foot ware.
-
Where trench depth exceeds 1.5m Contractor has installed trench shoring or benching as required?
-
Safe access & egress, to & from trenches has been made available for site personnel? I.e ladder or other means.
-
Trenches are fenced off or barricaded when trench is left open?
-
Suitable lifting equipment is available for the works being carried out?
-
Traffic Management has been installed as required?
Sewer Reticulation Works
-
Commencement of sewer reticulation works?
-
Are trench widths adequate for pipe size/type? Refer to standard drawing SEW-1201-V pipe embedment & trench fill typical arrangements.
-
Is the bedding material installed in accordance with design documentation & standard drawing SEW-1202 standard embedment flexible & rigid pipes?
-
Has the trench floor been excavated or compacted to provide a flat firm base to support bedding material & minimise pipeline settlement?
-
Are pipes installed in accordance with design documentation & relevant authority specifications?
-
Does trench backfill material comply with design documentation & relevant authority standard drawings?
-
Are required clearances to other services being maintained as per relevant authority specifications?
-
Is mechanical compaction being carried out in accordance with authority specification? Particularly within the support zone & around manholes, maintenance shafts & inspection shafts.
-
Sewer manholes constructed as shown on design documents?
-
Are lids & covers installed in accordance with with design documentation?
-
All plugs have been removed from stage sewer reticulation works?
Status of water authority tests
-
Has ovality testing of sewer reticulation works been completed?
-
Has successful vacuum testing of sewer reticulation works been completed?
Status of Authority Verification Forms
-
Status of authority Development Deed Document?
-
Status of authority Pre-commencement Verification Form?
-
Status of testing of sewer reticulation works?
-
Status of authority Construction Verification Form?
-
Status of authority as-constructed verification form?
-
Status of authority EDLP Verification Form?
-
Any additional information for the status of Verification Forms, testing &/or construction activities?