Title Page
-
Site conducted
-
Conducted on
-
Prepared by
Large Bending Machine / Folder inspections and service
-
Visual inspection
-
Check rams for imperfections
-
Check clamps for imperfections
-
Operational handles / buttons / foot switches fully functioning
-
E-stop in place and working
-
Guards in place and secure
-
Limit switches fitted securely and operational
-
Replace oil
-
Re-grease height adjuster spindles
-
Control panel door closed and not accessible without use of tool or key
-
Risk assessment visible
-
Any additional information