Title Page

  • Site conducted

  • Plot number

  • Tenure

  • Works carried out by

  • Conducted on

  • Prepared by

Ventilation 1st fix

  • Ducting installed and supported in accordance with manufacturer instructions and NHBC recommendation of 750mm fixing centres.

  • Core holes drilled and solid ducting installed through

  • Extract grills or airbricks are installed and connected to ducting?

  • Additional information?

1st Fix Inspections

  • Drawing no. and Revision

  • Kitchen Drawing no. and Revision

  • Cables are installed to their final accessory boxes as per the drawing no. above?

  • Why?

  • Cables are securely fixed to the joists?

  • Cables are securely fixed to walls inc. capping if applicable

  • Cables are protected where passing through metal frames and walls

  • Cables are marked with height/locations and descriptions with marker pen (Grid outlets/stats)

  • Cables to be pulled through ceiling are identified with coloured tape and/or nogging installed?

  • All ELV cabling installed to final locations and segregated from LV by 50mm minimum?

  • SWA installed to meter cupboard and supported throughout?

  • Downlight measurements taken? And offered to Supervisor/Contracts manager

  • Putty pads/ intumescent gaskets installed

  • Plot/area is left clean and tidy

  • Why?

  • Supervisor signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.