Title Page
-
Site conducted
-
Plot number
-
Tenure
-
Works carried out by
-
Conducted on
-
Prepared by
Gas Carcass
-
Gas pipework installed to current standards/ taped or protected as necessary
-
All pipe sleeves are fitted and sealed?
-
Pressure test carried out?
-
Test pressure and duration
Pre-Plumbs
-
Soils - Low level boss/branches installed correctly, adequate fall to stack?
-
Shower connection pre plumb completed?
-
Shower outlets fitted to correct location/height?
-
Shower mixer fitted to correct location/height?
-
Bath pre-plumb competed with pipes capped?
-
Concealed cistern fitted?
-
Cistern and flush pipe correct height
-
Shower tray fitted?
-
Protection installed?
Soils 1st fix
-
All SVP pipework installed, clipped and secure inc hair felt to NHBC requirements
-
All SVP pipework in roof space clipped, durgo valve fitted or connected to roof tile vent?
-
Access rodding eye installed as required?
-
Pressure test carried out?
-
Test pressure and duration?
-
Witnessed by?
-
Additional information?
1st Fix Pipework
-
Drawing no. and Revision
-
All setting out correct to current house design and drawings?
-
All pipework clipped and secure?
-
All pipework marked and labelled?
-
All open ends capped/taped off?
-
All pipework tested as per manufacturers instructions?
-
All noggings fitted by others?
-
Water main from water riser to internal cupboard? (Flats only)
-
Fit stopcock and check valve for Water Byelaw Inspection?
-
Flue sleeves fitted if req.?
-
Vertical flue in roof space fitted?
-
Supervisors signature