Title Page

  • Site conducted

  • Plot number

  • Tenure

  • Ventilation strategy

  • Works carried out by

  • Conducted on

  • Prepared by

Ventilation 1st fix

  • Drawing number and Revision

  • Ducting installed and supported in accordance with manufacturer instructions and NHBC recommendation of 750mm fixing centres.

  • Fire collars installed as per the fire strategy?

  • Extract grills or airbricks are installed and connected to ducting?

  • Additional information?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.